说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 项目控制水平
1.
ANALYSIS OF KEY ELEMENT TO RAISE THE PROJECT CONTROL LEVEL
提高工程项目控制水平的关键环节分析
2.
ESTABLISHING PROJECT CONTROL SYSTEM TO INCREASE PROJECT MANAGEMENT LEVEL;
建立项目控制体系 提高项目管理水平
3.
Stringent control was exercised to block new projects in processing industries and avoid redundance in low-level development.
严格控制新上加工工业项目,防止低水平重复建设。
4.
Achieving Excellency, Establishing Brand-Name and Striving for "Lu-Ban Prize", Striving for Enhancement of Overall Project Management Level in Process Control;
创优创品创“鲁班奖”,在过程控制中努力提升项目管理整体水平
5.
ENHANCING PROJECT MANAGEMENT AND CONTROL LEVELS TO ACCELERATE THE TRANSITION TO INTERNATIONAL ENGINEERING CORPORATIONS;
提高项目管理与控制水平 加速向国际型工程公司过渡
6.
The deformation monitoring items of the dam for Shanxi Hydropower Station include the elevation control network close to the dam area, plane control network of triangulation and trilateral, dam collimation line and settlement monitoring.
珊溪水电站大坝变形监测项目包括近坝区高程控制网和平面边角控制网、坝视准线及沉陷观测。
7.
The research of control measure in whole process of hydrotechnice funds;
对水利项目资金全程控制措施的研究
8.
PLC Training Development of the Liquid Level Control System
基于PLC的水箱液位控制实训项目开发
9.
Research on Investment Controlling of SAR Project of JCIC;
吉化集团公司含硫废水制酸项目投资控制研究
10.
The Risk Management of a Certain Enterprise s Open Platform Integration Control Project;
某企业开放平台集中控制项目的风险管理
11.
Construction Cost Control of the Engineering Project Based on WBS Platform;
以WBS平台为基础实现工程项目施工成本控制
12.
Raising the Level of Drawing up Plans and Budgets for Geological Survey Projects;
浅议提高地质调查项目设计预算编制水平
13.
Study on constrain factors in construction management of EPC project
制约EPC项目施工管理水平的若干要素探讨
14.
Research on Sanshui Jiayuan Construction Project Cost Management and the Control Method;
三水佳苑工程项目成本管理与控制方法研究
15.
Research of Schedule Plan and Schedule Control of Fire System of Jingshui Building;
晶水大厦消防工程项目进度计划与控制研究
16.
Duration Effecting Factors Identify & Controlling Research of South-to-North Water Transfer Project;
南水北调项目工期影响因素及其控制措施研究
17.
Supervisory Control Function of Post-evaluation to the Hydraulic Construction Projects;
谈水利建设项目后评价的监督控制作用
18.
On the material expenses control of construction item of middle and small water conservancy exterprise;
中小型水利施工企业项目材料费用控制的探讨