说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水利工程措施
1.
Hydraulic engineering measures for ecological restoration on the downstream of the main Tarim River
塔里木河干流下游生态修复的水利工程措施
2.
On the Frequently Asked Questions and Settled Way in Water Conservancy Projects Cost Auditing;
浅议水利工程造价审核的常见问题及应对措施
3.
Discussion on Engineering Measures of Improving Effective Utilization Coefficients in Canal Water;
浅谈提高渠系水有效利用系数的工程措施
4.
The loss status of the WR project management units and the turning loss measures;
广西水利工程管理单位亏损情况及扭亏措施
5.
Temperature Control Measures for Concrete Engineering of Works on Outer River of Changzhou Hydraulic Complex
长洲水利枢纽外江工程混凝土施工温控措施总结
6.
Measures for prevention of silt plug and abrasion in Xiaolangdi Hydro Project
小浪底水利枢纽工程预防泥沙淤堵和磨蚀的工程措施
7.
Effect of Hydraulic and Hydro-power Projects on the Diversity of Hydrobios and Protective Measures
水利水电工程对水生生物多样性的影响与保护措施
8.
The Project Characteristics and Construction Measures of "Xiangzhangli·Nashuian"
“香樟里·那水岸”工程特点及施工措施
9.
Curtain wall project rainproof water percolation design and construction measure
幕墙工程防雨水渗漏设计及施工措施
10.
The article puts forward some improved measures based on the problems existing in the course of supervising water conservancy construction.
文章根据水利工程建设监督工作存在的问题,提出了改进措施。
11.
Technology and Measures on Mixed Sand Processing of Tingzikou Water Control Project
亭子口水利枢纽混合砂加工工艺措施
12.
Problem from dam foundation grouting with stable grout for Qiafuqihai Water Control Project and relevant treatment measures
恰甫其海水利枢纽大坝工程基础稳定性浆液灌浆中的问题及措施
13.
Preliminary analysis on waste water treatment for Huashangou Hydropower Station in construction period
华山沟水电站工程施工期废水处理措施初探
14.
The research of control measure in whole process of hydrotechnice funds;
对水利项目资金全程控制措施的研究
15.
Geological regulation of construction period for hydropower and water resources project
水电水利工程施工地质规程
16.
The Analysis of Construction Engineering Risks at Shanxiu Hydropower Station and the Preventative Measures
山秀水电站工程施工风险分析及防范措施
17.
Study on Test of Settling Basin for Oncomelania Snail and Drawing Water in Middle-level Project;
沉螺池和中层取水工程措施试验研究
18.
The Protective System of Water and Soil Conservation Measure for The Pipe
新疆管道工程水土保持防治措施体系