说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 起拱控制
1.
Pre-camber Setting and Over-camber Control in In-situ Casting of Simply-supported Box Beam with Bracket Method
支架法现浇简支箱梁预拱度设置及起拱控制浅谈
2.
Control Methods and Experiment Research in Deflection Upwards of P.C. Beams;
预应力混凝土梁的起拱度控制方法及试验研究
3.
Theoretical Analysis Calculation and Control Methods Research in Deflection Upward of Pre-stressed Concrete T-Beam
预应力混凝土T梁起拱度理论分析及控制研究
4.
Control of the Shape of Concrete Fill Steel Tube Arch Bridge s Rib While it is Installation;
钢管混凝土拱桥拱肋吊装中的拱轴线形控制
5.
Main arch construction control of the half-through steel pipe concrete arch bridge
中承式钢管混凝土拱桥主拱施工控制
6.
Theoretic Calculation And Control Methods Research In Deflection Upward of Prestressed Concrete Beam;
预应力混凝土桥梁起拱度的理论计算和控制方法的研究
7.
The Line Shape Control of Ateel Box Arch Rib of External Slanted Arch Brigdge;
外倾式钢箱拱桥扣索吊装拱肋线形控制
8.
Arch column and joint construction quality control of large span concrete arch bridge
大跨径混凝土拱桥拱上立柱接头施工质量控制
9.
Control Techniques in the Construction of the Arch Rib for CFST Tied Arch Bridge
钢管混凝土系杆拱桥拱肋施工控制技术
10.
Linear Control Techniques for the Arch Ribs in Large-span Steel-pipe Concrete Arch Bridge
大跨度钢管混凝土拱桥拱肋线形控制技术
11.
The upwarp control measures of mass concrete prefabrication box beam
大体积混凝土预制箱梁上拱控制措施
12.
Cracking Analysis and Tensile Stress Control Method Research for Arch Dam
拱坝开裂分析及拉应力控制方法研究
13.
Construction Control Research of Long-Span Concrete Filled Steel Tubular Arch Bridges;
大跨度钢管混凝土拱桥施工控制研究
14.
Application of TMD and MTMD in Arch-bridge Vibration Control;
TMD和MTMD在拱桥振动控制中的应用
15.
Model Testing Study on Construction Control of Arch Bridge with Cast-In-Place Canlilever Method;
拱桥悬臂现浇施工控制模型试验研究
16.
Exploration on Seismic Control of Long-span Reinforced Concrete Arch Bridges
大跨径钢筋混凝土拱桥减震控制探索
17.
Construction Control Method of Long-Span Steel Box Tied Arch Bridge
大跨度钢箱系杆拱桥的施工控制方法
18.
Formwork construction technique for controlling the shape of high double-curvature arch dam
控制双曲高拱坝体型的模板施工技术