说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 项目支出分配比例
1.
How to Determine the Optimal Structure of China's Expenditure on National Defense--An Empirical Study on the Distribution Proportion of Project Expenditure
我国国防费最优结构的确定——对项目支出分配比例的实证研究
2.
expenditures were incurred without allotments
未分配到款项的支出部分
3.
Support requested from the TI Program as percentage of total project cost
需要技术进步项目支持的资金占项目总成本比例
4.
An optimization of government expenditures by accounting item and government tax revenue--A study on the application case of regression analysis in optimization;
国家财政主要支出项目与各项税收收入的最优化——回归分析在最优化中的应用研究实例
5.
Those that are difficult to associate with specific inventory items may be prorated on some equitable basis.
那些很难与具体存货项目相联系的成本要在公平的基础上按比例分配。
6.
Case Study on the Funds-payment of Electric Power Construction Commissioned Management Project
电厂委托建设管理项目工程款支付案例分析
7.
total technical cooperation project expenditures
技术合作项目支出总额
8.
An Empirical Study on the Effect of Fiscal Expenditure on the Current Account of China;
我国财政支出对经常项目影响的实证分析
9.
An Empirical Analysis of Factors in the Budgetary Slack of University Programmed Expenditure--Based on the Data Analysis of Questionnaire Survey among Universities in Xinjiang
新疆高校项目支出预算松弛影响因素分析
10.
How are the Loss and Expenditure Embodiedto Be Profit Distribution Disbursed in ProfitAfter Paying the Taxes;
这项损失和支出是怎样体现为利润分配在税后利润中列支的
11.
in proportion to the expenditure of living labor
比例于活劳动的支出
12.
Development of Performance Index for Public Financial Program Based on Stakeholder Theory--Taking a High Education Program as an Example;
基于利益相关者理论的财政支出项目绩效评价——以高校某教育项目为例
13.
You call to determine whether you want to allocate the pre-sales support cost on this project for catering the next phase project.
你打电话决定你是否想分配下一阶段本项目预售支持成本.
14.
A Study of Evaluation System on the Project of Agriculture Supported by Finance;
财政支农支出项目绩效评价体系研究
15.
Research on Performance Evaluation of Local Agricultural Finance Projects;
地方财政支农项目支出绩效评价研究
16.
It is far simpler to evaluate public projects undertaken through a bank loan than through a direct public expenditure grant.
评价以银行贷款所进行的公共项目,要比评价通过直接公共支出拔款进行的公共项目简单得多。
17.
To divide, distribute, or assess proportionately.
按比例分配按比例分、分发或估量
18.
ANALYSIS OF CONSTRUCTION DELAYS AND COST OVERRUNS IN PALESTINE--THE CASE OF GAZA STRIP;
巴勒斯坦建设项目延期和超支分析——加沙地带案例(英文)