1.
Research on the Coal-Fired Power Plant Desulfurization (Denitrogenation) Compensation Price Mechanism
燃煤电厂脱硫脱硝电价补偿机制研究
2.
The analysis and argument of the ESP control system in power plant
电厂脱硫工程控制系统的分析与论证
3.
The Analysis and Study on the Desulphurization Project of Handan Thermal Power Plant;
对邯郸热电厂脱硫方案的分析与研究
4.
Study on Causticity of Reheated Desulfurized Gas in Thermal Power Plant;
火电厂脱硫烟气再热后腐蚀性的研究
5.
The Rebuilding of DCS in FGD of Huaneng Luohuang Power Plant;
华能珞璜电厂脱硫工程DCS系统改造
6.
The Research of the Desulphurization Project Management in Zhuzhou Power Plant;
株洲电厂脱硫工程监理项目管理研究
7.
Study of Scheduling Management of the Expand Projects of Power Plants;
火电厂脱硫扩建项目的进度管理研究
8.
China Development Report on Desulphurization and Denitration Industries in Power Plants in 2008
我国火电厂脱硫脱硝行业2008年发展综述
9.
The Influence of FGD System to Dust Removing Character in Power Plant;
火电厂脱硫工艺对除尘效率的影响研究
10.
The Desulfurization Process with Carbide Slag in CFB Boiler;
电石渣在电厂烟气脱硫工艺中的应用
11.
Cost Research of Thermal Power Plant FGD System
火电厂烟气脱硫装置成本费用的研究
12.
Comprehensive Fuzzy Evaluation of Flue Gas Desulfurization Technologies for Thermal Power Plant;
火电厂烟气脱硫技术的模糊综合评判
13.
Corrosive Characteristic Research on Heat Pipe GGH after Wet Flue Gas Desulfurization in Power Plant;
火电厂湿法脱硫后热管式GGH腐蚀研究
14.
Feasibility Study on FGD of DaLaTe Power Plant;
达拉特电厂烟气脱硫工程可行性分析
15.
Study on Limestone Activity in Flue Gas Desulfurization Process of Coal-Fired Plant;
火电厂烟气脱硫过程石灰石活性研究
16.
A Research on Flue Gas Desulphurization Project in the Case of 300MW Unit in Shiheng Power Plant;
石横发电厂300MW机组烟气脱硫项目研究
17.
An Empirical Study on DEO Control System of Gas Desurphure Plant in Fire Power Station;
火力发电厂烟气脱硫DEO控制系统研究
18.
Automatic control system for environment protection desulfuration of power plants based on SIEMENS S7-400H
基于SIEMENS S7-400H的电厂环保脱硫控制系统