说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 改造试验
1.
Study on HCR Process Modification Test of Wasterwater Treatment Plant in Xiao Shan District;
萧山区污水处理厂HCR工艺改造试验研究
2.
Study and Experiment of Anti-tangential Circle Burning of State Product 2008t/h Boiler;
国产2008t/h锅炉反切圆燃烧改造试验研究
3.
Reconstruction on Testing System of Universal Hydraulic Testing Machine
液压万能材料试验机测试系统的改造
4.
Improvement on the Experimental Equipment of Fluid Flow Pattern;
流体流动型态(雷诺试验)实验设备改造
5.
The Flow Path Retrofit and Evaluate Test of a 125MW Steam Turbine;
125MW汽轮机通流部分改造及评价试验
6.
Experimental Research and Retrofit of the Uniformity of Coal Powder Supply in 200MW Unit;
200MW机组给粉均匀性试验研究及改造
7.
Studies on reform of boiler burner and burning adjustment test;
锅炉燃烧器改造及燃烧调整试验研究
8.
Study on the Technology Transformation and Performance Test for ZGM95G Coal Grinding Machine in JIU GANG
酒钢ZGM95G型磨煤机技术改造及试验研究
9.
The Study on Reconstruction Project of APMP Wastewater Treatment
APMP废水处理改造工程试验研究
10.
Testing research of upgrading revamping technology for waste water treatment plant
污水处理场升级改造技术的试验研究
11.
Reformation of boiler for low NO_x emission and experimental analysis
锅炉低NO_x排放改造及试验结果分析
12.
Improvement and Application of Performance Experimental Table of Refrigerating Compressor
制冷压缩机性能试验台的改造及应用
13.
The Reconstruction of the Test and Control System for Universal Test Stand for Hydraulic Machinery in DFEM;
东电水力机械通用试验台测试与控制系统改造
14.
contractor's tria
承造厂试航承造厂试验
15.
The Test and Application of Inserted Bar Anchorage Technology in Water Tank Consolidation and Renovation
植筋锚固技术在水池加固改造中的试验与应用
16.
Experimental Study and Modification Practice for the Printing and Dyeing Wastewater Treatment of Bannner and Tent Factory;
旗篷厂印染废水处理试验研究和工程改造实践
17.
Performance Test and Technical Improvement of the Water-film Dust Collector in 100MW Power Plant;
100MW机组文丘里水膜除尘器性能试验及技术改造
18.
Study on Retrofit to Flow Passage of Domestic 300MW Steam Turbine and the Thermal Performance Test;
国产300MW汽轮机通流改造及电厂试验研究