1.
Approach for setting time buffers in resources-constrained project scheduling
资源受限项目调度中缓冲区的设定方法
2.
Research on Algorithms for Solving Resource-Constrained Project Scheduling Problems;
求解资源受限项目调度问题算法的研究
3.
Research on Project Scheduling Constrained with Flexible Resource Based on Heuristic Algorithm;
基于启发式算法的柔性资源受限项目调度研究
4.
Flexibility Resource Constraints Project Scheduling Problem on the Base of Critical Chain Method;
基于关键链的柔性资源受限项目调度问题研究
5.
Research on Resource-Constrained Project Scheduling Problem with Generalized Precedence Relations;
带广义紧前约束的资源受限项目计划问题求解
6.
Application of genetic algorithm in solving fuzzy resource-constrained project scheduling problem;
求解模糊资源受限项目调度问题的遗传算法
7.
Critical Chain Based Approach for Resource-constrained Project Scheduling;
基于关键链的资源受限项目调度新方法
8.
Heuristic approach for resource-constrained project scheduling problems
求解资源受限项目调度问题的启发式方法
9.
Genetic simulated annealing algorithm for resource-constrained project scheduling problem
应用遗传模拟退火算法实现资源受限项目调度
10.
Scheduling Problems of Resource-constrain Project Based on a Culture Genetic Algorithm
基于文化遗传算法的资源受限项目调度
11.
A Genetic Algorithm for Solving RCPSP
一种求解资源受限项目调度问题的遗传算法
12.
ACO for Solving Resource-constrained Project Scheduling Problem
一种求解资源受限项目调度问题的蚁群算法
13.
Research on Multi-mode Resource Constrained Project Scheduling Problem Base on Particle Swarm Optimization;
基于微粒群算法的多模式资源受限项目调度优化问题研究
14.
Research on Resource Constrained Project Schedule Problem Based on Ant Colony Optimization;
基于蚁群优化算法的资源受限项目调度问题研究
15.
Ant colony and particle swarm optimization algorithm-based solution to multi-mode resource-constrained project scheduling problem;
蚁群-粒子群算法求解多模式资源受限项目调度问题
16.
An Algorithm for Solving the Resource Constrained Project Scheduling Problem;
资源受限的项目调度问题的求解算法
17.
Study of the Multi-project Scheduling Problem of Flexible Resource Constraint;
柔性资源受限的多项目调度问题研究
18.
Hybrid genetic algorithm for resource constrained multi-project scheduling problem
资源受限多项目调度的混合遗传算法