1.
Analysis on steel skeleton and climbing framework for construction of reinforced concrete arch rib
钢筋混凝土拱肋劲性骨架爬模施工分析
2.
Simulation Analysis of Rib Disassembly of RC Multi-span Arch Bridge
多跨钢筋混凝土拱桥拱肋拆除过程仿真分析
3.
Analysis of Moment Magnification Factor for Reinforced Concrete Rib Arch
钢筋混凝土肋拱桥弯矩增大系数计算分析
4.
Study on Residual Bearing Capacity Evaluation Mode of Reinforced Concrete Rib Arch Bridge
钢筋混凝土肋拱桥剩余承载力评价模式研究
5.
Technology of Demolition and Monitoring on Long-Span Reinforced Concrete Ribbed Arch Bridge
大跨度钢筋混凝土肋拱桥的拆除与控制技术
6.
Design Optimization on Axial Cord of Concrete Filled Steel Tube Arch Bridge;
钢管混凝土拱桥拱肋线形的设计优化
7.
Stability Research of Concrete-filled-steel Tube Arch Bridge on Filling Concrete for Arch Rib
钢管混凝土拱桥拱肋混凝土灌注施工稳定研究
8.
Hot rolled ribbed steel bars for the reinforcement of concrete
GB1499-1998钢筋混凝土用热轧带肋钢筋
9.
Control of the Shape of Concrete Fill Steel Tube Arch Bridge s Rib While it is Installation;
钢管混凝土拱桥拱肋吊装中的拱轴线形控制
10.
The Construction Technology of CFST Rib of Frame Tied Arch Bridges;
刚架系杆拱桥钢管混凝土拱肋施工技术
11.
Research on the Disposal Schemes of Arch Ribs in the Uban Wide CFST Arch Bridges;
钢管混凝土拱城市宽桥拱肋布置方案研究
12.
Construction Monitoring of CFST Arch Bridges and Calculation during Erecting Steel Tubular Arch Rib;
钢管混凝土拱桥施工监控与拱肋吊装计算
13.
Alveolate CFST Arch Bridge Ultimate Load Analysis;
拱肋脱空钢管混凝土拱桥极限承载力分析
14.
Construction Technique of Arch Rib in Pushan Long Span Concrete-infilled Steel Tube Arch Bridge
大跨度钢管混凝土拱桥拱肋施工技术研究
15.
Study of the Arch Rib Section of Concrete-filled Steel Tube Tied Arch Bridge
铁路钢管混凝土系杆拱桥拱肋截面形式分析
16.
Control Techniques in the Construction of the Arch Rib for CFST Tied Arch Bridge
钢管混凝土系杆拱桥拱肋施工控制技术
17.
Linear Control Techniques for the Arch Ribs in Large-span Steel-pipe Concrete Arch Bridge
大跨度钢管混凝土拱桥拱肋线形控制技术
18.
Influence of leaning angle of arch rib on concrete-filled-steel-tube arch bridge's static and dynamic mechanics properties
拱肋内倾角对钢管混凝土拱桥静动力学的影响