1.
Options of Signaling System for the Extension Project of Beijing Subway Line 4
北京地铁4号线延伸信号系统方案分析
2.
Analysis of Ground Distortion for Xisi Subway Station on the Line 4 of Beijing Subway
北京地铁4号线西四站地面变形与分析
3.
CFD Simulation on Tunnel Fire Smoke Control in Beijing Metro the 4th Line
北京地铁4号线隧道火灾烟气控制的CFD模拟
4.
Line 13 of Beijing Metro is the first ground line of Beijing urban rail transit.
北京地铁13号线是北京城市轨道交通的第一条地面线路。
5.
Shield Launching on a Small-radius Curve to Bypass a Barrier
北京地铁10号线盾构小曲线避让障碍始发施工
6.
Operation Scheme for Beijing Metro Line 13 in Case of Breakdown
北京地铁13号线故障情况下运营方案研究
7.
The construction technology bury shallow and dig invisible of the station of Chongwenmen of 5th line of the underground in Peking
北京地铁五号线崇文门站浅埋暗挖施工技术
8.
Research on Construction Technology of Puhuangyu Station under Beijing Subway No.5 Line;
北京地铁五号线蒲黄榆车站施工技术研究
9.
Shadow Price Analysis of the Ten the Bid Section Projects of Beijing Subway No.10 Line;
北京地铁十号线十标段项目的影子价格分析
10.
Construction safety risk management of the Keyi road station on the Beijing subway ninth line
北京地铁9号线科怡路站施工安全风险管理
11.
On summery of initial supporting construction of transverse gallery of No.5 vertical shaft in Beijing rail underground transit line
北京铁路地下直径线5号竖井横通道初支施工
12.
Precipitation scheme and effect of Huayuan east road station of the tenth line on Beijing subway
北京地铁十号线花园东路站降水方案及效果
13.
Relationship Analysis on Station Capacity and Passenger Flow:A Case of Beijing Subway Line 1
北京地铁1号线车站设施与客流关系分析
14.
There are four underground lines in Beijing,
北京有四条地铁线,
15.
Analysis and Suggestions of Land Use Patterns along Rail Transit Corridor-A Case Study of Beijing Metro Line 1
轨道交通沿线土地利用分析及建议——以北京地铁1号线为例
16.
Subway Open-Cut Construction Technology;
北京地铁五号线蒲黄榆站东北风道明挖施工工艺技术
17.
A Study on the Key Construction Technology about the Double Connecting Tunnel in BaiXue Internal Tunnel of Beijing Metro Line 4;
北京地铁四号线白学区间双渡线段施工关键技术研究
18.
In-Situ Test and Analysis on the Vibration Mitigation Measures of the Elevated Line in Beijing Metro Line 5
北京地铁5号线高架线减振措施现场测试与分析