说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 300m级拱坝
1.
Simulation model test of spraying polyurea as anti-seepage layer on 300-m high arch dams and its application
300m级拱坝喷涂聚脲防渗仿真模型试验及应用
2.
Deformation behavior of 300m high-concrete face rockfill dams
300m级超高面板堆石坝变形规律的研究
3.
Effect of Creep Characteristic of 300m Level High Rockfill Dam with Core Wall
300m级超高土质心墙坝的长期变形特性研究
4.
Three-dimensional Finite Element Analysis of Stress Deformation of 300 m Level Core Rockfill Dam
300m级心墙堆石坝三维有限元应力变形分析
5.
Analyze on Development Prospects of 300 m Level Ultra-high CFRD from Shuibuya High CFRD
从水布垭高面板堆石坝看我国300m级超高面板堆石坝的发展前景
6.
Study on Three-dimension Seepage and Abutment Stability of Jinping High Arch Dam;
锦屏一级高拱坝三维渗流场及坝肩稳定性研究
7.
Analysis on Stress and Deformation of Jinping I High Arch Dam
坝基加固后锦屏一级高拱坝应力变形计算分析
8.
Safety monitoring and operation management for Huaguangtan Ⅰ arch dam
华光潭一级拱坝安全监测及运行管理
9.
Research on the seismic safety of high arch dam system of Jinping Project
锦屏一级水电站高拱坝整体抗震安全性研究
10.
The Study of the High Arch Dam Exceptionally Large Foundation Cushion Stability of Jinping 1 Hydropower Project
锦屏一级水电站高拱坝大垫座稳定性研究
11.
Simulation and Analysis of Temperature Control of Left Bank Concrete Pedestal of Jinping I Arch Dam
锦屏一级拱坝左岸混凝土垫座温控仿真分析
12.
Study on Jinping Ⅰ Arch Dam Left Abutment Foundation Treatment
锦屏一级拱坝左岸基础处理加固措施研究
13.
The Global Stability Safety Research of Jinping Grade One HydroPower Station Arch Dam Abutment Rock;
锦屏一级水电站拱坝坝肩岩体整体稳定安全度研究
14.
Stability Study of High Arch Dam Abutment of Jinping Ⅰ Hydro-power Station by Three-dimensional Geomechanics Breakage Model Test;
锦屏一级高拱坝坝肩稳定三维地质力学模型破坏试验研究
15.
Static and Dynamic Stability Analysis of Jinping High Arch Dam Abutment Using RBSM;
锦屏一级高拱坝坝肩动静力稳定性刚体弹簧元分析
16.
Analysis of Stability of Jinping High Arch-Dam Based on Nonlinear Finite Element Method;
基于非线性有限元法的锦屏一级高拱坝整体稳定分析
17.
Experimental study on dynamic flexural-tensile mechanical behavior of three-graded concrete in Xiaowan Arch Dam
小湾拱坝三级配混凝土动态弯拉力学特性试验研究
18.
Control blast technology for slope excavation works above EL. 300m on left bank of Xiangjiaba hydropower project
向家坝水电站左岸300m高程以上边坡开挖工程施工控制爆破技术