1.
It is complex optimum problem to design the nuclear piping system.
核级管道系统的设计是个复杂的优化问题。
2.
Application of LBB Technology for Design of Nuclear Pipes Beyond Creep Temperature
LBB在蠕变温度以上核级管道设计中的应用
3.
Erection Discussion of Nuclear Safety Pipes in Reactor
反应堆中核安全级管道的安装技术问题讨论
4.
Welding Procedure Qualification(WPQ) for the Super Pipe Speed Intercepting Valve Weldment of Nuclear ClassⅡ
核Ⅱ级超级管道-快关隔离阀焊接件的焊接工艺评定
5.
Together with the construction project, the map shallbe presented to the higher authority in charge of urban roads for approval before its promulgation for implementation.
连同修筑计画,经报上级市区道路主管机关核定后,公布施行。
6.
Please check with your system administrator before upgrading.
请在升级之前与系统管理员进行核对。
7.
Research on Modeling and Management Technology of SoC Transaction Level IP Core;
SoC事务级IP核建模与管理技术研究
8.
Three-Grade Assessment Determining Good or Bad Group Management Going Efficient in the Long Run;
三级考核定优劣 队伍管理见长效
9.
Class 100 clean tunnel with filter tube structure
100级管道式过滤结构洁净通道的研制
10.
Research on Performance Assessments System of Xinjiang Sanye Pipelines & Technology Duty Co.Ltd;
新疆三叶管道公司绩效考核体系研究
11.
Welding technology conclusion of 3R55 dome pipes in Ling'ao 2 period nuclear power plant
岭澳二期核电站3R55穹顶管道焊接技术
12.
Application of all-position activate welding in pipeline
A-TIG焊在核电管道全位置焊接中的应用
13.
Welding quality control of the primary loop pipe in the 1000 MW nuclear reactor
1000MW核反应堆主回路管道焊接质量控制
14.
The Effect of Two Grade Calculation System to the Cost Management in Sugar Mill
论二级核算制在糖厂成本管理中的作用
15.
Core Risk Prevention and Management for the Commercial Bank Branch in Central China;
中部地区分行级商业银行核心风险防控与管理
16.
Discussion on Quality Assurance Classification Management in Guangdong Ling ao Phase II Nuclear Power Project;
广东岭澳二期核电工程质保分级管理的探讨
17.
Considerations about Reforming the Evaluation Method of the Advanced Financial Management Course;
改革高级财务管理课程考核方法的思考
18.
Exploration of nuclear power enterprise “STAR” management performance evaluation system;
核电企业星级管理绩效评价体系的探索