1.
Reconstruct of 3D Model of Huiquan Substation from Point Cloud
利用点云数据进行惠泉变电站三维重建
2.
Study on Schedule Control of Fengquan 500kV Substation Power System Innovation Project;
丰泉500kV变电站系统切改工程进度管理研究
3.
Design discussion of retrofit of QuanZhou 500kV Substation's the integrated automation system
泉州500kV变电站综合自动化系统改造的设计探讨
4.
Design of 110KV Integrated Automation System of Substations of Windmill Plant at Shipaishan, Huilai, Guangdong Province;
广东惠来石碑山风电场110KV变电站综合自动化系统的设计
5.
The Study on Computerized Five-prevention Operation System of 500kV Non-attended Substation of Fu Quan;
福泉500kV无人值守式变电站微机五防操作系统的开发及应用研究
6.
Drive along Huihe Expressway, leave the expressway at Si Jiao Lou or Tai Mei Exit, via Pingling to Longmen Hot Spring.
走惠河高速,由四角楼或泰美站出,经平陵到龙门温泉。
7.
Optimal Study on Cooperating Operation for Hydropower Stations of Siquan and Xihe River;
石泉、喜河水电站联合优化调度研究
8.
Analysis of structural calculations for branch pipes subject to high hydraulic pressures of Huizhou pumped storage station
惠州抽水蓄能电站岔管结构计算分析
9.
The fact is that the spring on Mount Hui has been there from time immemorial. That is why Mount Hui is also known as Hui'Quan'Shan or Hui Spring Hill where the spring is a source of top-quality water well-known in China.
事实上,惠山自古就有泉,所以“惠山”也叫“惠泉山”,泉水甘冽,驰名天下。
10.
Supervision on the Underground Project and Lower Reservoir of Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站地下工程及下水库工程监理
11.
Project Quality Supervision Research for Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站工程质量监督工作探索
12.
The Binding-together Bidding of the Main Machine Equipment for the Baoquan Pumped Storage Power Station;
宝泉抽水蓄能电站主机设备的统一招标
13.
On bad geological phenomenon of Baoquan pumped storage power station project highway
宝泉抽水蓄能电站上库公路不良地质现象分析
14.
Characteristic and Activity of Fault 304 in Huizhou Pumped Storage Power Station Site Area
惠州抽水蓄能电站厂址区F304断裂特征及活动性
15.
Analysis on Fault Treatment of Lower Adit in Plant A of Huizhou Pumped Storage Power Station
惠州抽水蓄能电站A厂下平洞断层处理分析
16.
Ground-stress Testing Result Application of Huizhou Pumped Storage Power Station
惠州抽水蓄能电站工程地应力测试成果应用
17.
Waterway Safety Monitoring System of First Plant of Huizhou Pumped-storage Power Station
惠州抽水蓄能电站A厂水道安全监测系统
18.
Design and Running of the Blocking Dregs Dam in Huizhou Pumped Storage Power Station
惠州抽水蓄能电站拦渣坝设计运行探讨