说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 长洲水电厂
1.
Application of Highly Reliable Electric Secondary System Construction Scheme to Changzhou Hydropower Plant
高可靠性电力二次系统建设方案在长洲水电厂的应用
2.
Analysis on Operation Mode of Station Service System on Outer River of Power Station of Changzhou Hydraulic Complex under Special Conditions
长洲水利枢纽电站外江厂用电特殊情况下的运行方式分析
3.
Quality Control over Concrete Appearance for Power House on Outer River of Changzhou Hydraulic Complex
长洲水利枢纽外江厂房混凝土外观质量控制
4.
Seepage treatment for expansion joints at drainage ditch of unit 1 at Shazhou power plant
沙洲电厂1号机组排水沟伸缩缝泄漏处理
5.
Improvement on fixing seal strips of hydroturbine guide-vane of Gaobazhou Hydropower Plant
高坝洲电厂水轮机导叶密封安装方法改进
6.
Large-size bolts assembling and disassembling in hydroturbine maintenance of Gezhouba Hydropower Plant
葛洲坝电厂水轮机检修中的大型螺栓拆装
7.
Application of Control System to Portal Crane on Dam Crest of Power House on Inner River of Changzhou Hydraulic Complex
长洲水利枢纽内江厂房坝顶门机的控制系统应用
8.
Analysis on Phase-lead Operation of Generator at Power Station of Changzhou Hydraulic Complex
长洲水利枢纽电站发电机进相运行分析
9.
Strategic Meaning of Lusigang Power Station in Developing the Port Group of the North Wing Yangtze River Delta;
吕四港电厂在长江三角洲北翼港口群建设中的战略意义
10.
hydroelectric(power) statio
水(力发)电厂[站]
11.
The Bent-frame Construction Scheme of Upstream Hoist of Factory Workshop in the Extension Project of Yanzhou Hydropower Station,Lixian County,Hunan Province
湖南澧县艳洲水电站扩机土建工程厂房上游启闭机排架施工方案
12.
The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法
13.
Trial and Application of Primary Frequency Regulation Function for Hydro-turbine Generator Unit in GZB Hydropower Plant
一次调频功能在葛洲坝电厂水轮机组的试验与应用
14.
Application of Programmable Computer Controller in Reformation of Gezhouba Hydro-plant Governor
PCC可编程计算机控制器在葛洲坝水电厂调速器改造中的应用
15.
Experiment Study on Hgdranlic Fill Dam for Fly Ash Storefield of Changchun Thermal Power Plant
长春热电厂储灰场水力冲填坝试验研究
16.
Improved Design of Carrying Project Control Method at Changqing Water and Power Supply Department;
长庆水电厂工程施工质量控制方案改进设计
17.
Study on the Growth Regularity and Control of Microorganism of the Cooling Water in Power Plant;
电厂冷却水微生物生长规律及控制措施研究
18.
Initial Economic Operation and Optimal Scheduling of Power Station at Changzhou Hydraulic Complex
长洲水利枢纽电站初期经济运行与优化调度