1.
Problems and Its Treatment Measures in Interlocked Precast Concrete Block Construction
联锁式砼预制块施工中的问题及处理措施
2.
Construction Technique of Continuously Changing Hight Prestressed Concrete Beam 0 #;
变截面预应力砼连续梁0#块的施工
3.
Analysis of the Estimating the Value of the Concrete Pile Foundations Parameter in Wuhu Area;
芜湖地区砼预制桩桩基参数取值分析
4.
Control and Prevention of Construction Cracks in Cast-in-place Reinforced Concrete Plate
现浇钢筋砼板施工裂缝的控制及预防
5.
Control and management of cracks at walls of top storey of concrete small block buildings
砼小砌块住宅顶层墙体裂缝的控制与处理
6.
The paper introduced some control methods and measures of part prestress concrete continuous box beam.
简要介绍装配式部分预应力砼连续箱梁桥施工中的几个关键部位控制方法与措施。
7.
PLC control to 3-PTT parallel machine tool with slider
3-PTT型滑块式并联机床的PLC控制
8.
form of presentation of the United Nations budget and duration of the budget cycle
联合国预算的编制方式和预算周期
9.
Research on the Girder s Deflection of Long-Span Prestressing Concrete Continuous Girder Bridges;
大跨度预应力砼连续梁式桥主梁下挠研究
10.
Construction Technique of Great Span Pre-stressed Concrete Continuously Beam Style Support Cast-in-place
大跨度预应力砼连续梁梁式支架现浇施工技术
11.
individual lever power interlocking
单独手柄式动力联锁
12.
electromechanical interlocking device
电机式闸门联锁装置
13.
free lever type relay interlocking
自由手柄式继电联锁
14.
all-relay coded interlocking
全部继电电码式联锁
15.
interlocking signals
联动式信号,连锁信号
16.
On the Cost Control in High Strength PHC Pile Foundation Design;
高强度预应力砼管桩设计造价控制浅析
17.
air traffic control interlock
空中交通管制联锁装置
18.
block signal interlocking
与闭塞制结合的联锁法