说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 丁坝坝头
1.
Local scour on the head of a spur dike is disadvantageous to the structures.
丁坝坝头的局部冲刷对丁坝的整治效果产生不利影响。
2.
The groin abutment degradation depth prediction model based on BP neural network
基于BP神经网络的丁坝坝头冲刷深度预测模型
3.
Experimental study on stability of sand ribbed soft mattress of dike head for macro-tidal estuary
强潮河口丁坝坝头砂肋软体排护底稳定性试验研究
4.
heap stones to form a dam
把石头堆成一道堤坝
5.
There are horse shoe vortex around spur dikes and Karman vortices behind spur dikes.
发现在丁坝的上游会形成马蹄涡 ,在丁坝的背风面会形成卡门涡 .
6.
Numerical study of the process of tidal bore turning over the groin
涌潮翻越丁坝过程数值试验初步研究
7.
The Experiment Research of Spur-dikes Influence on Flow Pattern in Bend;
丁坝对弯道水流流态影响的试验研究
8.
The villagers went at building a dam with a will.
村民们劲头十足地着手修一座水坝。
9.
Joint structure model test of asphalt concrete core of embankment dams
土石坝沥青混凝土心墙接头模型试验
10.
Study on Types of Hydropower Development of Zhentouba Reach on Daduhe River;
大渡河枕头坝河段水电开发方式研究
11.
Application of the measure of scour prevention of spur dike foundation in the practical engineering
丁坝基础冲刷防护措施在工程中的应用
12.
Erosion and siltation study for low sheet-pile groins under tidal bore
涌潮条件下排桩式低丁坝水力学冲淤试验研究
13.
Experimental study on reducing the size of circulating region in the downstream of spur dikes
吸、喷水法减小丁坝下游回流尺度的试验研究
14.
Effect of sheet-pile groins on protecting dykes and flats in tidal bore estuary
涌潮河口桩式丁坝的护滩保塘效果分析
15.
The Study on Stability and Protection Technology of Spur Dike in the Middle Reach of the Yangtze River;
长江中游航道丁坝稳定性及防护技术研究
16.
3D Numerical Simulation of Turbulent Flow and Local Scour Around Spur Dikes;
丁坝附近紊流的三维数值模拟及局部冲刷
17.
An Experiment Study on the Characters of Permeable Spur Angle Scour and Deposit;
透水丁坝挑角对河床冲淤特性影响的试验研究
18.
Study on Calculation Method for Surface Curves Above Single Row Permeable Pile Groin
单排井柱桩透水丁坝上游水面线计算研究