说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 排洪洞
1.
Lixi Tailings seepage grouting permanent row of hongdong research
栗西尾矿库永久排洪洞注浆防渗研究
2.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验
3.
Study on Model Test for Estimating Scouring in Bedrock during Ski-jump Energy Dissipation at End of 1# Spillway Tunnel of Zipingpu Project
紫坪铺1号泄洪排沙隧洞挑流基岩冲刷模型试验研究
4.
Research on Simulation of Diversion Flood Routing for Flood Storage in Dongting Lake Region;
洞庭湖区蓄洪垸分洪洪水演进模拟研究
5.
Numerical Simulation of Three-Dimensional Turbulent Flow Field in Spillway Tunnel;
双洞式溢洪洞三维紊流场的数值模拟
6.
Rock slide treatment for spillway tunnel of Chahanwusu Hydropower Station
察汗乌苏水电站溢洪洞洞室塌方处理
7.
Study on the Flood Disaster and Control Measures in the Dongting Lake Region;
洞庭湖区洪涝灾害及防洪减灾对策分析
8.
Discussion on discharge capacity calculations of drainage system of tailing ponds
某尾矿库排洪系统泄洪能力计算探讨
9.
The Han clan from Hongtong Shanxi province during the Ming and Qing Dynasties;
明清时期的山西洪洞韩氏——以洪洞韩氏家谱为中心
10.
land drainage and flood path system
土地排水及防洪道系统
11.
Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel;
导流洞改建泄洪洞衔接段水力特性研究
12.
The Study on the Folld Disaster Mechanism and Its Ecological Control in Dong Ting Lake
洞庭湖洪水致灾机制与生态治理研究
13.
ANALYSIS OF THE NATURAL PRECIPITATION IN 1995 IN FLOOD SEASON AND WATER LEVEL OF DONGTING LAKE
洞庭湖洪水规模与1995年自然降水分析
14.
Aseismatic Analysis and Optimization Design for Inlet of Diversion Tunnel;
导流泄洪底洞进口段抗震及优化分析
15.
3-D Numerical Simulation on Flood Discharge Tunnel with High Water Head and Free Water Surface;
高水头明流泄洪洞三维数值模拟研究
16.
Flood and Waterlogged Loss Dynamic Assessment Based on GIS;
基于GIS的洞庭湖区洪涝灾害动态评估
17.
Talking about the Engineering Geological Condition of Spillway Tunnel of Qianian Reservoir and Its Evaluation
千年水库泄洪洞工程地质条件及评价
18.
Design and Research on Flood-Discharge Power-Generating Hole of Baiyekou Reservior
柏叶口水库泄洪发电洞的设计与研究