1.
Virtual Reality Application in the Simulation Design of Main Control Room of Nuclear Power Plant;
虚拟现实在核电站主控室仿真设计中的应用
2.
Technical Plan for Improving Reliability of Main Control Room Communication System in Nuclear Power Plants
核电厂主控室通信系统可靠性改进技术方案
3.
Emergency Committee Office of Guangdong Province for Nuclear Power Accident
广东省核电站事故应急委员会办公室
4.
The Evaluation System Based on Database for Human-Machine Interface of Advanced NPP Main Control Room;
基于数据库的核电厂先进主控制室界面设计评估系统
5.
Interconnection and Safety Control of Information Network of Daya Bay Nuclear Power Plant
大亚湾核电站网络互联及安全控制
6.
Research of the Improvement of Adjuster Control of Heavy Water Reactor Power Plant;
重水堆核电站调节棒控制改进的研究
7.
Surveying Control of 108m Height Exhaust Chimney in Tianwan Nuclear Power Station
田湾核电站108m高排风塔测量控制
8.
Security-class DCS Control System Design at Hongyanhe Nuclear Power Station
红沿河核电站安全级DCS控制系统设计
9.
Design for control rooms of nuclear power plants
GB/T13630-1992核电厂控制室的设计
10.
STUDY OF SAFETY CONTROL OF FOUNDATION PIT EXCAVATION BY BLASTING IN NINGDE NUCLEAR POWER PLANT
宁德核电站核岛基坑爆破开挖安全控制研究
11.
They advocate the retention of our unclear power plants.
他们主张留存下来我们的核发电站。
12.
Study of Nuclear Power Plant Owner s EPCs Management Mode;
核电站业主的EPCs管理模式的研究
13.
Supervisory Control and Data Access Application in Nuclear Power Plant Grid Control Room;
微机监控系统在核电站网控楼应用研究
14.
nuclear power statio
核发电站,原子能发电站
15.
Differences between Reactor Coolant Pumps Used in Qinshan Phase II NPP Project and Daya Bay NPP
秦山核电二期工程主泵与大亚湾核电站主泵的差异及其影响
16.
Design and Realization of Substation Laboratory Telecontrol System;
变电站实验室远动控制系统的设计与实现
17.
Process Control and Countermeasures to Cavern Excavation in Right Bank of Jinping Hydropower Station Dam
锦屏电站大坝右岸洞室开挖过程控制及对策
18.
Bridge Balance Control of Fuel Handling Machine for Daya Bay Nuclear Power Plant
大亚湾核电站核燃料运输吊车桥架驱动双控制器闭环控制