说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 环境保护验收调查
1.
Analysis of the EIA effectiveness for highway noise from the environmental protecting acceptance check
从竣工环境保护验收调查分析公路噪声环评的有效性
2.
Preparation of Investigation Program and Report of Acceptance Check in terms of Environmental Protection for Completed Construction Projects
建设项目竣工环境保护验收调查方案和报告的编制
3.
Study on Preparing the Report of Environmental Protection Acceptance Check for Oilfield Productivity Exploitation Construction Projects;
浅谈油田产能开发建设项目竣工环境保护验收调查报告的编制
4.
Review on methods of Environmental Protection Check for the Completed Hydropower Project and its application
水电工程竣工环境保护验收调查技术方法与实践
5.
Investigation Methods for Ecological Environment Impact During Completed Acceptance of Expressways
高速公路竣工环保验收生态环境影响调查方法
6.
within 30 days of receipt of the text on environmental protection in the preliminary design of a construction project and the report on inspecting and accepting the completed environmental protection facilities
初步设计环境保护篇章、环境保护设施竣工验收报告的三十日内
7.
"upon completion of the project, submit a report on inspecting and accepting the completed environmental protection facilities."
竣工后,必须报送环境保护设施竣工验收报告。
8.
Discussions on Monitoring on Environmental Protection Construction Project for Check and Accept of Completed Project
建设项目竣工环境保护验收监测工作探讨
9.
Investigation of Environmental Protection and Development of Flax Industry in Yunnan Province;
云南省亚麻产业发展及其环境保护问题调查
10.
Investigation and Research of Environmental Protection Volunteer's Action Situation in Beihua University
大学生环境保护志愿者活动现状的调查研究
11.
Environmental Research and Protection Countermeasure on The Source of Drinking Water in The Town of Xinjiang. Jiang
新疆城镇饮用水水源地环境调查与保护对策
12.
Environmental protection authorities should made inspections on the progress made by units being ordered to handle their pollution problems within a definite time, and conduct acceptance checks on items completed with the harnessing by the prescribed time,
环境保护部门应当检查限期治理单位的治理情况,对完成限期治理的项目进行验收,
13.
The Task and Countermeasures of Current Situation on Environmental Monitoring for Examination and Acceptance of the Newly Completed Source in Environmental Management
建设项目竣工环境保护验收监测在环境管理中的任务与对策
14.
On Perfecting the Environmental Tax System;
突出保护环境功能 完善环保税收制度
15.
(7) having the facilities to guarantee coal mine safety in production and environmental protection facilities, which have been proved up to the standard through the acceptance test conducted upon completion of the project; and
(七)有竣工验收合格的保障煤矿生产安全的设施和环境保护设施;
16.
The environmental protection departments of the coastal provinces shall be responsible for organizing, coordinating, supervising and inspecting the marine environmental protection work in their respective administrative areas
沿海省环境保护部门负责组织协调、监督检查本行政区域的海洋环境保护工作,
17.
The Understanding of the Dianchi Environmental Protection and the human Life by the Residents around the Dianchi Drainage Area;
滇池流域居民关于滇池环境保护与人的生活的认知——滇池环境保护意识与行为状况调查
18.
Conflicts and Their Avoidance in the Area of Environmental Regulation and Investment Protection under NAFTA-An Analysis of the Expropriation Clause;
从征收条款看NAFTA环境管制与投资保护问题的冲突与协调