说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 托换工程
1.
STUDY ON THE APPLICATION OF STRUCTURAL TECHNOLOGY FOR UNDERPINNING ENGINEERING OF HIGH-LOADED PILE FOUNDATION;
大轴力桩基托换工程结构技术的应用研究
2.
Design of Pile Foundation Underpinning Work of Expressway Elevated Bridge of Guangzhou Airport
广州机场高速路高架桥桩基托换工程设计
3.
On application of underpinned technology of micro-pile in bridge abutment reinforcement project
微型桩托换技术在桥台加固工程中的应用
4.
Research of Embedded Later Enlarging Pier Replacement Construction Technique for Zhao Yang Building Project;
朝阳大厦工程后植式扩底墩托换施工技术试验研究
5.
Analysis of the Applying Pile Foundation Underpinning Technology in Xin Gang 4th Road Subway Project
桩基托换技术在新港四号路地道工程中的应用分析
6.
Application of Micro pile-soil nail Retaining Wall Composite Technology in Soft Soil Excavation
微型桩托换加固与复合土钉支护在软土基坑工程中的应用
7.
A Study on the Monitoring Safety of Great-axial-load-pile Underpinning Technology;
大轴力桩基托换施工安全监测的研究
8.
Time-Frequency Transform Tool wavelet Transform and the Application to Project;
时频变换工具—小波变换及其工程应用
9.
Study on the Agent Construction System Management Procedure of Government Investment Projects;
政府投资工程委托代建管理程序研究
10.
Cultivation of Students′ Engineering Quality Based on the Course Characteristics
依托课程特色 培养学生工程素质
11.
Integral Transforms & Dynamic Engineering
积分变换与动力工程
12.
Bumping/layoff procedures
工作替换/临时解雇程序
13.
replacement of lift foundation
升降机底座更换工程
14.
Dynamic Test during the Construction Course of the Jin-bin Light Railway Pier Active Underpinning
津滨轻轨桥墩主动托换过程中的振动测试研究
15.
Multi-task Based Principal-agent Analysis for Engineering Supervision;
基于多任务委托的工程监理委托—代理分析
16.
Motivating Model Construction of the Payment Term of Project Audit Based on the Theory of Agency and Game Theory
委托代理理论下工程委托审计付费激励模式
17.
Control on Schedule and Quality during Engineering Regulation Process for Tuoketuo Power Plant, Phase II;
大唐托克托电厂二期工程调试过程中工期和质量的控制
18.
Underpinning Technology of Subway Tunnel Crossing Through Bridge Piles Foundation
地铁隧道穿越桥梁桩基的托换施工技术