说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 塔梁同步施工
1.
Construction Control of Long-span Cable-stayed Bridge and Method of Tower and Beam Synchronous Construction
大跨度斜拉桥施工控制和塔梁同步施工方法
2.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
3.
The girder is braced against an erection bracket.
梁支撑在塔柱上的一个施工托架上。
4.
Analysis and Studies on the Structure of Combined Steel Tower Used for Bridge Construction;
桥梁施工用组合钢塔结构分析与研究
5.
Study on Construction Controlling Technology of Hybrid Cable-stayed Bridge with Single Tower;
独塔混合梁斜拉桥施工控制技术研究
6.
Girder Construction Technique of Single Tower Cable-stayed Curve Bridge Without Back Cable
独塔无背索弯坡斜拉桥主梁施工技术
7.
Study on the Key Technology of the Steel Pylon s Construction Survey of Super-huge Bridge;
特大型桥梁钢索塔施工测量关键技术研究
8.
Analysis and Construction Technology of Lower Cross Beam Pre-stressing of Main Pylon of Minpu Bridge Ⅱ
闵浦二桥主塔下横梁预应力分析及施工技术
9.
Construction Techniques of Cable-stayed Cantilever Truss Beam
小溪塔大桥斜拉悬臂桁架梁施工技术要点
10.
Construction Techniques for Rigid Fixity Section of Pylon and Girder of Navigable Bridge of Shenzhen Bay Highway Bridge
深圳湾公路大桥通航孔桥塔梁固结段施工技术
11.
Optimizing Construction Schemes for Lower Cross Beam of Main Tower of Changshou Yangtze River Bridge in Chongqing
重庆长寿长江大桥主塔下横梁施工方案优化
12.
The Construction of Concrete Cable Bent Tower and Design & Computation of Crossbeam Bracing Structure of the Long-Span Bridge;
大跨径桥梁混凝土索塔施工及横梁支撑体系设计与计算
13.
Construction Discussion on Live Transmission Lines Crossing 220 kV Double Circuit on the Same Tower
跨越同塔双回220kV带电线路施工探讨
14.
Construction Technology for Steel Structure Work of Sky Walk-Path in Guangzhou New TV Tower
广州新电视塔钢结构工程空中漫步道施工技术
15.
Research on Analyses of Construction and Seismic Response and Optimization of Closure Jacking-Force of Low-Pylon Cable-Stayed Bridge Based on Beam Element;
基于梁单元的矮塔斜拉桥施工与地震计算和合龙顶推力优化研究
16.
Analysis of Reasonable Finished Dead State and Simulation of Construction Control of a Cable-stayed Bridge with Single Inclined Tower and Hybrid Girder;
独斜塔混合梁斜拉桥合理成桥状态分析与施工控制模拟
17.
Research on the Erection Plan of Steel Box Girder and the Construction Process of Three-Tower Suspension Bridge
三塔悬索桥钢箱梁架设方案研究及施工过程分析
18.
Research on Tower Erection Technique of 500 kV Compact Double-circuit Transmission Line
500 kV紧凑型同塔双回输电线路组塔施工工艺研究