说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 苗家坝水电站
1.
Study on Hydraulic Model Test of the Left Spillway in Miaojiaba Hydropower Station
苗家坝水电站左岸溢洪道水力模型试验研究
2.
Tests and research on aeration facility for spillway tunnel of Miaojiaba hydropower station
苗家坝水电站溢洪洞掺气设施的试验研究
3.
Study on the Special Slope Stability in Miaojiaba Hydropower Station of Bailongjiang
白龙江苗家坝水电站特殊边坡稳定性研究
4.
Stability Analysis Against Deep Sliding of the Dam Foundation of Two Dam Section for Xiangjiaba Hydropower Station;
向家坝水电站两个坝段坝基深层抗滑稳定分析
5.
Dam Body Filling Design by Stages for Concrete Face Rock-fill Dam of Hongjiadu Hydropower Station
洪家渡水电站面板堆石坝坝体填筑分期设计
6.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
7.
Study on the Treatment Scheme of Soft Foundation for Shuinuijia Embankment Dam;
水牛家电站心墙土石坝坝基处理方案研究
8.
Investigation on stability against deep level sliding of Xiangjiaba hydrostation gravity dam
向家坝水电站重力坝深层抗滑稳定性研究
9.
Dam Partition Temperature Control for Left Bank of Xiangjiaba Hydropower Station
向家坝水电站左岸坝体分缝温度控制研究
10.
Installing Technique of A Style Tower Cable Crane for Xiangjiaba Hydropower Project
向家坝水电站A型塔架式缆机安装技术
11.
dam - diversion type hydroelectric power station
坝-引水混合式水电站
12.
Studies on Embankment Matials Test and Compacting Test of Shui Niujia Power-station Embankment Dam Project;
水牛家水电站大坝工程施工期筑坝材料试验及碾压试验研究
13.
Research on Tailrace System of Tunnel with Sloping Ceiling in Right Bank Underground Hydropower Station;
金沙江向家坝水电站右岸地下电站变顶高尾水系统研究
14.
MONITORING RESULT ANALYSIS OF ROCKMASS STABILITY AT THE LEFT ABUTMENT FOR LIJIAXIA HYDROPOWER STATION
李家峡水电站左坝肩岩体稳定监测成果分析
15.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织
16.
Analysis of Static, Dynamic Calculation of Lijiaxia Arch Dam;
李家峡水电站拱坝静、动力计算分析研究
17.
Study on Simulation and Optimization for the Construction Diversion Process of Xiangjiaba Hydropower Station;
向家坝水电站施工导流过程仿真与优化研究
18.
Dynamic Visualization Construction Diversion of XiangJiaBa Hydroplant;
向家坝水电站施工导流动态可视化研究