1.
The Analysis of Primary Frequency and Study on Simulation for Thermal Generator Unit
火电机组一次调频特性的分析及仿真研究
2.
Matlab-Based Simulations of Primary Frequency Control for Large Thermal Generating Unit
基于Matlab的大型火电机组一次调频特性仿真
3.
Simulation analysis on dynamic characteristics of primary frequency regulation for electric generator set
水口电机组一次调频动态特性仿真分析
4.
On-line Monitoring and Computing of Unit PFR Characteristic Parameter Based on PMU
基于PMU的机组一次调频特性参数在线监测
5.
Performance Analysis and Experimental Research on Primary Frequency Regulation of Hydroelectric Generating Set;
水电机组一次调频性能分析及试验研究
6.
Realization of Primary Frequency Regulation for Generator Units in Gezhouba Hydropower Plant
葛洲坝电厂机组一次调频功能的实现
7.
Control Etrategy and Optimization of Primary Frequency Modulation on Thermal Power Unit
供热发电机组一次调频策略及其优化
8.
Analysis and Simulation on the Primary Frequency Regulation and Isolated Grid Operation Characteristics of Hydraulic Turbine Regulating Systems
水轮机调节系统一次调频及孤立电网运行特性分析及仿真
9.
Primary Frequency Regulation Analysis for Generators of Central China Power Grid in 2009
2009年华中电网统调机组一次调频试验分析
10.
Implementation of Primary Frequency Regulation on Water-turbine Generator Set in Xiaoshan Hydropower Station
小山电站水轮发电机组一次调频功能的实现
11.
The application of high voltage varying frequency speed adjustment on air blower of 600MW unit
高压变频调速在600MW发电机组一次风机上的应用
12.
Analysis and improvement on primary frequency regulation control system of hydro generator units
水电机组一次调频控制系统分析与功能完善
13.
Primary Frequency Modulation Simulation and Parameter Identification for Hydroelectric Generating Set
水轮发电机组一次调频仿真与参数辨识
14.
Primary Frequency Regulation Test of Generator Units of Tianshengqiao Hydropower Station
天生桥水力发电总厂机组一次调频试验
15.
Research and implementation of primary frequency regulation for pumped-storage units in East China Power Grid
华东电网抽水蓄能机组一次调频研究和实施
16.
The Coordinate Flaw Solution of Gezhouba Hydropower Plant AGC and Primary Frequency Modulation
葛洲坝水电厂AGC调节与机组一次调频配合缺陷的解决方法
17.
The primary frequency regulation test on 135 MW circulating fluidized bed units
135MW循环硫化床机组一次调频试验
18.
Application and Analysis of Primary FM Function for 300MW Power Unit
300MW机组一次调频功能的应用与分析