1.
This paper compares this form of supply with electrical boiled water tank by using dynamic annual computation cost.
本文利用动态的年计算费用法将这种供应形式与电开水器进行了比较。
2.
annual premium costing
养老金交费逐年计算法
3.
The practically calculating method of the casting quantum in construction supervision fee
施工监理取费中计费额的实用计算法
4.
Determining Congestion Cost of Transmission Network by the Cost flow Method;
基于费用流法的输电阻塞费用计算及分摊
5.
Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;
网络计划工期费用优化及其蚁群算法
6.
Unit prices of the materials used in the clean-up operation,the calculation methods employed, the administrative, transportation and other expenses involved in organizing such a clean-up operation,
单价、计算方法,组织清除的管理费、交通费、及其他有关费用,
7.
Calculation of the Economic Benefit of the Electric Locomotive by the New cost Benefit method
采用费用效益法计算电力牵引的经济效益
8.
Time-cost Tradeoff Optimization of Construction Projects Using Genetic Algorithms;
遗传算法在网络计划费用优化中的应用
9.
The Relationship Between EU As Well As the Govemments of Main EU Mernber Countrics and the Internatioanl Enterprisc;
利用计算机实现代数法分配辅助生产费用
10.
measurement ton method
按体积吨计算运费法
11.
Using this estimating equation, the manager can predict what the annual profit will be from the amount budgeted for research.
用这个估计公式,经理就可以根据科研预算经费额测算出年利润额。
12.
Some knowledge about independent fee formulated in “Design methods and calculating criteria of hydropower projects of 2002”;
对《水电工程设计概算编制办法及计算标准》中独立费用的认识
13.
A Method of Minimum Total Cost within an Infinite Calculating Period for Economic Analysis of a Hydroelectric Project
水电工程经济分析中无限计算期总费用最小法
14.
Exploration on Index Calculating Method of Railway Transportation Cost
铁路运输成本费用指数体系及计算方法
15.
Oil Sands Royalty Calculation and Related Laws in Canada;
加拿大油砂矿区使用费计算和法规介绍
16.
Calculation of the Above-Norm Payment of the Purchasing Cost Based on the Daily Generation Schedule;
基于日发电调度计划的超额支付费用算法
17.
Algorithm Design Based On Fuzziness Expenses Problem of the Minimum Born Tree;
基于模糊费用最小生成树问题的算法设计
18.
Period of Construction Cost Optimization Model and Algorithm Design About Project Progress Adjustment;
工程进度调整的工期—费用优化模型及算法设计