1.
The Layout Research about Large-scale Railway Junction Terminals and Main Marshalling Stations
大型铁路枢纽、区域编组站布局研究
2.
Manage Area - Delete or edit the properties for an area on the portal site
管理区域-删除或编辑门户网站上区域的属性
3.
The Database Results region cannot be edited because there is no current Web.
由于没有当前站点,所以不能编辑数据库结果区域。
4.
Coordination Simulation Model between the Departure System of Railway Marshalling Station and the District Dynamic Capacity;
铁路编组站出发系统与区间动态能力协调仿真模型的研究
5.
Construction of Bored Piles of Yezhi Lake Bridge,Wuhan North Marshalling Station in Developed Karst Area
武汉北编组站野芷湖大桥强岩溶地区钻孔桩施工
6.
Research on Robust Stage Plan of Railway Marshalling Station;
铁路编组站鲁棒性阶段计划编制研究
7.
Portfolio Bidding Theory of Cascade Hydropower Stations in the Regional Electricity Markets and It s Applications;
区域电力市场下梯级水电站上网组合竞价理论与应用
8.
regional basic synoptic network
区域基本天气观测站网
9.
regional station
区域站,地方无线电台
10.
Create Area - Create an area on the portal site
创建区域-在门户网站上创建区域
11.
F. The Review of District Organisations
六、区域组织检讨。
12.
Research on the Issues of Optimizing Operating Plan for Marshalling Station;
编组站作业计划优化编制若干问题研究
13.
Study on Analyzing Configuration and Coordination Capacity of Marshalling Station;
编组站系统结构分析及能力协调研究
14.
The Control System of Car Stopper Used in the Tail of Marshalling Yard Base on DeviceNet;
基于DeviceNet的编组站峰尾停车系统
15.
Study on Optimal Control of Hump Pushing Locomotive in Hump Yard;
编组站驼峰推峰机车优化控制的研究
16.
Design of the Field Operation System for Marshalling Station Based on PDA;
基于PDA的编组站外勤办公系统设计
17.
General and Software Design of GSM-R Handset Terminal for Mashalling Station;
GSM-R编组站手持终端及其软件设计
18.
Effect of Integrated Management and Control of CIPS on Marshalling Station
浅谈CIPS管控一体对编组站的影响