1.
The Present Situation and Countermeasures Research on the Third Golden Tax Project of Liaoning
辽宁省“金税三期工程”中存在的问题与对策研究
2.
Study on Synthetical Evaluation of Levying and Administration Benefits of the Golden Taxation Project (Second Phase);
金税工程(二期)征管效益综合评价研究
3.
A Study on Tax Policies towards “Farmers, Agriculture and Rural areas”during the period of Industry refunding Agriculture;
工业反哺农业时期“三农”税收政策研究
4.
Application of Modern Industry Engineering to the Golden Tax Project;
展望现代工业工程在金税工程中的应用
5.
Realization and the Research of Information Security Guarantee in the Golden Tax Project of Local Tax Department;
地税系统金税工程信息安全保障的研究与实现
6.
"The project contains the "Golden Customs", "Golden Cards", "Golden Tax Revenue"and other computerized communications systems to serve the financial institutions with their names headed by the acronym "Golden"."
这一工程包括"金关"、"金卡"、"金税"和其它"金"字头的计算机通信系统。
7.
The minister listed the major objectives and tasks for tax administration during the 10th Five-Year Plan period.
金人庆说,“十五”期间税收工作的主要目标和任务:
8.
For strengthenning collecting and management of the added value tax, our country government carried out the gold tax engineering.
为了加强增值税的征收与管理,我国政府实施了金税工程。
9.
Post-Evaluation of "Golden Taxation Project" on Basis of Tax Compliance Theory;
基于企业纳税遵从性理论的金税工程后评估的研究
10.
Performing Taxation Management and Operation for Pipeline Contract Project in Thailand;
在泰国从事管道承包工程的税金管理与操作
11.
Process optimization of third stage project of the Guhengqiao Water Plant in Pinghu City
平湖市古横桥水厂三期工程工艺优化
12.
Revenue is a main part of project cost.
税金是构成工程造价的一个重要内容,依法纳税是纳税人应尽的义务。
13.
Optimizing financial environments with "One Web,Three Databases";
建设“一网三库”工程 优化金融生态环境
14.
But at the same time, it should be included in the individual's current wage and salary income for the calculation and levying of individual income tax.
但同时应计入个人当期工资、薪金收入计征个人所得税。
15.
The Construction Technology for Sand Quilts Dike-Dam of the Miaoling Engineering(Phase 3) of the Lianyungang Port
连云港庙岭三期突堤砂被堤工程施工工艺
16.
Qinshan Phase Ⅲ (CANDU) Nuclear Power Porject Quality Assurance
秦山三期(重水堆)核电站工程质量保证
17.
A Progress Survey of Qinshan Phase Ⅲ (CANDU) Nuclear Power Plant Project
秦山三期(重水堆)核电站工程进展概况
18.
Study on Water Resources in the Third Project of Chen Ming Thermoelectricity Factory of Shandong;
山东晨鸣热电厂三期工程水资源研究