Application of Fully Mechanized Coal Mining Face Crossing over Rock Crosscut in Tucheng Mine
综采工作面跨石门开采在土城矿的应用
2.
Mining Practice of Crossing the Working Surface Which Put Goes Against the Coal By Support Hangs Moving
悬移支架放顶煤工作面跨石门回采实践
3.
Continuous mining technology through the large riser in the 12403 fully mechanized longwall mining face of Yun Jia-ling mine
云驾岭矿12403综采工作面跨上山连续回采技术
4.
Research on Cut Supporting Technology of Large-span Fully-mechanized Coal Face in Zhaogu No.1 Mine
赵固一矿大跨度综采工作面切眼支护技术研究
5.
Mining all Height at One Time Technology of Large Mining High Angle Compound Mining Working Face
大采高大倾角综采工作面一次采全高回采工艺
6.
Development and application of the technology for Shigetai Mine's longwall face #71203 to trasverse large fault
石圪台煤矿71203综采工作面过大断层技术研究与应用
7.
Research on Movement Characteristic of Surrounding Rock in Full-mechanized Mining Face with Large Mining Height
大采高综采工作面围岩活动特征研究
8.
Full-mechanized Mining Technology under Complex Geological Condition
复杂地质条件下综采工作面回采技术
9.
Highly gassy longwall coal faces with big mining heights:comprehensive mine gas control technology
大采高高瓦斯综采工作面瓦斯综合治理技术
10.
Comprehensive Gas Drainage Technology of Fully Mechanized Mining Face in Seam with Soft Roof,Soft Coal and Soft Floor
三软厚煤层综采工作面瓦斯综合抽采技术
11.
Longwall face all cross-sectional bolt-wire mesh:fast dismantling technology
综采工作面全断面锚网快速拆除技术
12.
Technique Practice of Transportation Side Tunnel Size of Large and Small Comprehensive Faces Linking;
综采工作面运输巷侧大小工作面对接工艺
13.
Surrounding Rock Control Study of the Coal Entry with Greater Mining-Height;
大采高综采工作面回采巷道围岩控制技术研究
14.
Study on the Gas Migration in the Goaf Filling of Full-mechanized Mining Working Face
综采工作面充填开采采空区瓦斯运移研究
15.
The Applied Research of Gas Drainage Technology in the Goaf of Full-Mechanized Mining Working Face
综采工作面采空区瓦斯抽采技术的应用研究
16.
Technology of30kt/d Full-mechanized Mining with Large Mining Height in Large Angle Coal seam
日产30kt大采高大倾角综采工作面开采技术
17.
Grouting Reinforcement Construction Techniques on 68302 Fully Mechanized Face
68302综采工作面注浆加固施工方法
18.
Increasing Rate of Coal Mining with Improving Coal Caving Technology at Fully Mechanized Face
改进综放工作面放煤工艺提高回采率