1.
Atmospheric Environmental Impact Assessment for Baosan Iron and Steel Complex,Shanghai
上海宝山钢铁总厂大气环境影响预断评价
2.
INSPIRATION OF AMERICA AND CANADA BLACKOUT TO BOA-STEEL POWER NETWORK
美加大停电事故对宝山钢铁厂电网的启示
3.
BAOSTEEL GROUP SHANGHAI No.5 NEW 350000 t MINIMILL FOR STAINLESS AND SPECIALTY STEEL LONG PRODUCTS;
上海宝钢集团五钢公司新建年产35万t不锈钢及特殊钢长材短流程钢厂
4.
WHAT WE SHOULD LEARN FROM SHANGHAI BAO STEEL--Investigation about Development Strategy Adjustment of BaoSteel Group in Recent Years and Some Suggestions for Hebei Metallurgical Industry;
河北钢铁应向上海宝钢学什么——宝钢集团近年发展战略整合情况调查与建议
5.
We have placed or order for some steel with Anshan Iron and Steel Factory.
我们已向鞍山钢铁厂订购了一些钢材。
6.
We have the integrative produce line with advanced program control machines from Germany of silicon coated, compounded production, die-cutting.
工厂位于中国上海宝山,拥有近百亩现代化生产工业园地。
7.
a gasworks, ironworks
煤气厂、 钢铁厂.
8.
Fatigue strength evaluation of 110/25 t bridge crane in the Ironwork of Baoshan Steel Corporation
宝钢炼铁厂110/25t桥式起重机结构疲劳强度评估
9.
Optimization Practice of Injection System of BF 3, No.2 General Ironworks, Masteel
马钢二铁总厂3~#炉喷吹系统优化实践
10.
Constructing Mode of E-commerce System for Iron and Steel Enterprises in China:a Case Study on Shanghai Baosteel Yichang Sheet Metal Company;
钢铁企业电子商务系统的构建模式——上海宝钢益昌薄板有限公司的案例研究
11.
marine mole of iron or steel
海上防波堤,铁或钢制
12.
Talking About Creating and Developing of Shandong Lunan Ferroalloy Plant;
浅谈山东鲁南铁合金总厂的创新发展
13.
Discussion about the industry wastewater's recovery and exploitation in Nantong Baosteel
宝钢集团南通钢铁有限公司全厂工业污水回收及利用
14.
Specially: We are the total agent of Shanghai Power Plant Valve Factory in Foshan.
特别推荐:本公司拥有上海电站阀门厂在佛山市的总代理权。
15.
Automation system design of Tieshangang water supply plant
北海铁山港给水厂自动控制系统设计
16.
Box Culvert Jacking Technology for Northern Extended Section of Shanghai Metro Line 3 through Bao Steel's Special Railway Line
上海轨道交通3号线北延伸工程穿越宝钢铁路专用线的箱涵顶进技术
17.
First ROKOP CCM achieved productionquota smoothly at Handan Iron & SteelGeneral Works
邯郸钢铁总厂第一台罗可普连铸机顺利达产
18.
The Situation of Serious Disorders and Trentment of the No.10 BF of First Iron-smelting Plant at Masteel;
马钢一铁总厂10~#高炉炉况严重失常及处理