1.
When the engineer performs inspection, it is usually to determine that the structure, as completed, conforms to the plans and specs( specific ations).
工程师进行检查时,通常是确定建筑物在竣工时是否符合图纸和施工说明书。
2.
Revision of "Model Contract for Port & Waterway Engineering Construction Supervision;
《水运工程施工监理合同范本》修订说明
3.
Compilation and Introduction of Technical Code for Safety of Cuplock Steel Tubular Scaffolding in Construction JGJ166-2008
《建筑施工碗扣式钢管脚手架安全技术规范》JGJ166-2008的编制及其说明
4.
Discussion on Safe and Civilized Construction Management for Power Construction Enterprise;
论电力施工企业的安全文明施工管理
5.
The term "reproduction" as used in this Law does not cover the construction or manufacture of industrial products on the basis of drawings of engineering designs and product designs, and descriptions thereof.
按照工程设计、产品设计图纸及其说明进行施工、生产工业品,不属于本法所称的复制。
6.
By comparison analysis and construction feedback, it verified the effect of stabilization measures and demonstrated that the ship lock slope is stable as a whole.
通过比较分析和施工反馈的结果,证明了加固的效果,说明了三峡永久船闸体整体是稳定的。
7.
They are organized into divisions and sections representing, in the opinion of the specification writer, the trades that will be involved in construction.
说明书根据编制者的观点,按施工中所涉及的各个工种,分为若干章节。
8.
ECPWS (Engineering Change Proposal Work Satement)
工程更改建议说明书
9.
It was a statement of hope.
工作也说明有希望。
10.
Management of the Expense Spent on Safe and Civilized Constriction Measures;
论建设工程安全文明施工措施费用管理
11.
Study on the Security Civilization Construction Measure Expense Calculation
浅析建筑工程安全文明施工措施费的计取
12.
It is proved that the technique is feasible in the coarse and gravel sands by testing and construction the gunite pile technique.
通过喷浆桩的试验及施工,说明该项技术应用于粗砂、砾砂地层中是可行的。
13.
If corrective actions can not be completed within 15 working days, state the reason for delay and the time within which corrections will be completed.
如果在15个工作日不能完成整改措施,说明延迟的原因以及什么时候将完成整改。
14.
Apply accelerator to the surface on the bracket according to the following instructions:
按照下列说明为支架表面施用催化剂:
15.
It intro-duces the measures of improving the reliability of the system.
并就提高系统可靠性的措施作了说明。
16.
According to the gist of design and execution of complex high class pavement, the procedures and processing methods of design and execution of steamroll concrete complex pavement are declared, and an economic analysis is made to this kind of pavement.
就复合式高等级路面的设计施工要点,说明碾压式混凝土复合式路面的设计与施工的过程、艺方法。
17.
Discussion about Extraction,Use and Management of Safety Security and Civilization Measures Expenses of Construction Enterprise
浅谈建筑施工企业安全防护、文明施工措施费的提取、使用和管理
18.
showed that the introduction of the Working Time Directive,
表明《工作时间法令》的实施,