1.
high priority programme of the sewage strategy
污水处理策略重点工程项目
2.
The Efficient Method of File Management for the Key Projects;
强化重点工程项目档案管理的有效方法
3.
Reasoning of Fault and Countermeasures in Bidding Process;
对水利重点工程项目实行财务委派制的构想
4.
Management and Control of the Supply Period and Quantity of the Equipment for Jinan Steel's Major Project
济钢重点工程项目设备供期及质量管控
5.
Carrying out Key Farm-equipment Engineering Projects through Setting up and Perfecting Farm-equipment Service System;
建立健全农机服务组织是实施农机重点工程项目的重要保证
6.
Main Approaches and Benefit of the National Key Project Implementation for Soil and Water Conservation of Shanxi Province
山西省国家水土保持重点工程项目实施的主要途径及其效益分析
7.
Increasing technological applications in Olympic projects ?
抓好重点项目,强化科技项目与工程项目的结合。
8.
Key and method of quality control of engineering project construction working procedure;
工程项目施工工序质量控制重点及方法
9.
Cost control on construction phase of construction projects
建设工程项目施工阶段的造价控制重点
10.
A Study on Implementing Project Management in Key Port Construction Projects;
关于港口建设重点工程实行项目管理的探讨
11.
The construction of 60 key projects progressed smoothly. By the end of 2001, 57 projects was started or restarted, of which 14 projects have been completed basically.
60项重点工程建设进展顺利,到年末开复工项目57个,其中14个项目基本建成。
12.
Exercising the Engineer System in Large Engineering Project;
重大工程项目须实行《工程师制度》
13.
Navigable hydraulics,hydraulic engineering techniques in engineering designs,engineering project evaluation and evaluation of key courses (engineering subjects).
通航水力学、工程项目评估、工程设计中的水利工程技术,重点学科(工科类)评估。
14.
Research on Cost Management Emphasis of the Owner in Every Project Construction Stage;
谈业主在工程项目建设各阶段造价管理的侧重点
15.
On the application of project management methods on national key archives' rescue projects
论项目管理方法在国家重点档案抢救工程中的运用
16.
Discussion on the Quality Control of Project Constrution
对工程项目施工质量控制的几点认识
17.
The hot-blast stove is an important auxiliary facility of the blast furnace and its building and lining engineering is a key item in the blast furnace system engineering.
热风炉是高炉的重要附属设施,热风炉砌筑工程是高炉系统工程中的重点项目。
18.
She said that the progress in the construction of key chemical projects was comparatively quick.
她说,化工重点项目建设进展较快。