说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 溢流堰高度
1.
hydraulic crest
塔盘上液面超出溢流堰高度
2.
The liquid holdup of each tray is related to the geometry of the trays, different weir height is used to describe the holdup change during startup period.
通过塔板的结构特性,利用不同的溢流堰高度描述了塔板积液的变化情况。
3.
Study on the Curve Overflow Weir Dispatch of the Exile Silt Experiment in Small North Branch of the Yellow River
黄河小北干流放淤试验弯道溢流堰调度研究
4.
EFFECT OF STEPPED SPILLWAY ON CONTAMINATION WATER BODY WITH DIFFERENCE CONCENTRATION
阶梯式溢流堰对不同浓度污染水体的影响研究
5.
Selection of the form construction plan of weir surface concrete of the overflow weir of Ancun Reservoir
安村大坝溢流堰堰面砼模板施工方案选择
6.
weir to inside surface of tank
溢流堰至容器内壁的距离
7.
Hydraulic Characteristic Analysis and Numerical Simulation on the Outflow of Weir and Sluice under High Submerged
高淹没度下闸堰出流水力特性分析与数值模拟
8.
Application of Hydraulic Overflow Weir in the Automatic Control of Canal System
水力自动溢流堰在自动调控渠系中的应用
9.
Effects from matrix of overflow weir and bio-membrane on re-aeration of water body and water quality
溢流堰基质及生物膜对水体复氧及水质的影响
10.
efflux flow cup pattern viscometer
溢流杯式毛细管粘度计
11.
River bed in the downstream of spillweir of Dangjiangkou Project has produced intensive scour owing to the effect of fracture properties of foundation rock.
丹江口堰顶溢流坝下游河床,由于受基岩构造特性的影响,产生较大的冲刷。
12.
Overflow weir is used to control water hammer and prevent air entrainment in long supply pipelines.
在长距离输水管路出口设置溢流堰可以有效控制水击和防止管路脱空。
13.
Calculation and Application of the Mixed Weir of Small Reservoir Spillway
小型水库溢洪道混合堰的计算与应用
14.
Calculation and Analysis on Temperature Stress of Roller Compacted Concrete Overflow Dam;
碾压混凝土溢流坝温度应力计算分析
15.
A Study on the Liquidity Measure and Illiquidity Risk Premium of China Stock Market;
中国股票市场流动性度量及溢价研究
16.
"Excessive oil pressure .This may result from a stuck relief valve, an excessively strong valve spring, a clogged oil line, or excessively heavy oil. A defective oil pressure indicator may read high."
油压过高:这是因溢流阀被卡
17.
The Quality Control in the Construction of High-pressure Jet-grouting Watertight Wall of the Construction Diversion Cofferdam of Longhuakou Hydropower Station
龙华口水电站施工导流围堰高喷防渗墙施工质量控制
18.
Hydraulic Model Test on Side Weir of Spillway in Haozhi Reservoir Project
蒿枝坝水库工程溢洪道侧堰水工模型试验研究