1.
installation of mechanical and electric equipment of hydroelectric power station
水电站机电设备安装
2.
The Installation Schedule and Optimization Method for Mechanical and Electrical Equipment of Hydro Power Station
水电站机电设备安装施工进度计划及优化方法
3.
Installing Analysis of Burying Part of Turbine in Hydrodynamic-power Station;
小型水电站水轮机埋设部件的安装分析
4.
Surge arrestors are usually used in telecoms equipment installations such as mobile base stations, networks, modem and cable television set-top box designs.
电涌放电器通常被用在电信设备安装,例如移动电话基站、络、制解调器和有线电视机机顶盒。
5.
Brief Introduction to the Mechanical and Electrical Equipment of Jiangsu Yixing Pumped Storage Power Station
江苏宜兴抽水蓄能电站机电设备简介
6.
Structural Joint Seepage Treatment for Erection Bay of Hydropower Station
某水电站安装间结构缝渗漏处理设计
7.
Installing Technique of A Style Tower Cable Crane for Xiangjiaba Hydropower Project
向家坝水电站A型塔架式缆机安装技术
8.
Research on the Project Progress Management about Electrical Equipment Installment and Debugging of Transformer Substation
变电站电气设备安装调试项目进度管理研究
9.
Feasibility Analysis of Differential Valve Applied to Accident Distributing Valves of Large Hydropower Turbine Control Equipment
大型水电站水轮机控制设备事故配压阀采用差装阀的可行性分析
10.
Installation of guidevane mechanism of hydro-turbines of Liushuping Hydropower Station
柳树坪水电站水轮机导水机构安装调整
11.
Rough-in communication - phone, cable, computer, alarm
安装通讯设备(电话、电缆、计算机和报警设备等)
12.
Talk about Safety Identify of Electrical and Mechanical Equipment in Pump Station;
对泵站机电设备安全鉴定的几点认识
13.
Discussion on Improving the Installation Quality in Secondary Equipment's Maintenance Prevention
试论如何提高变电站二次设备安措的装设质量
14.
INSTALLING TECHNIQUE OF 50MW HYDRO GENERATOR WITH EVAPORATIVE COOLING IN POWER STATION
52.5 兆瓦蒸发冷却水轮发电机电站安装技术
15.
New Installation Technology of Bottom Ring for Hydro Turbine Water Distributor
三峡电站Alstom水轮机导水机构底环安装新工艺
16.
A simple and easy method for making cost estimate of equipment erection in hydropower project
编制水电工程设备安装费概算简易法
17.
Installation Technology of 850kW Wind Turbine Generator
850kW风力发电机设备安装技术
18.
Practice proved that the option on electromechanical equipment for Letan hydropower station was rational.
实践证明,乐滩水电站机电设备的选型是合理的。