1.
Analysis on the accident of #1 transformer switch operation in Buqiao 220kV substation
220kV步桥变1#主变跳闸事故分析
2.
Once over the Bridge of Cloud Footsteps, we were on the path leading up to the main peak.
过了云步桥,我们开始走上攀登泰山主峰的盘道。
3.
Passengers may cross by the footbridge.
乘客可使用步行桥.
4.
Can we walk on the bridge?
我们能到桥上步行吗?
5.
Don't be in step when you cross a bridge
你们过桥时不要齐步走。
6.
Nanpu Bridge East Main Approach Integral Synchronizing Jacking Project
南浦大桥东主引桥整体同步顶升工程
7.
Tell the soldiers to be out of step when they cross that wooden bridge
告诉士兵们过那座木桥时不要齐步走。
8.
I pace off the wooden bridge and found it was about100feet long.
我步测出那座木桥长约100英尺。
9.
The passengers got out and walked across the bridge.
乘客从车上下来,步行过桥。
10.
Between the bridge and the fort, stood a single company of infantry.
在堡垒和铁路桥之间站着一连步兵。
11.
The soldiers broke step when they crossed the stone bridge.
士兵们过石桥时乱了步伐。
12.
I walked through an overpass over the road.
我步行穿过那条公路上面的立交桥。
13.
ADVANCE AND DEVELOPMENT OF MODERN TECHNOLOGY FOR CONSTRUCTING RAILWAY BRIDGES IN CHINA
我国现代铁路建桥技术的进步与发展
14.
Study on Soft Swith Full Bridge with Current Doubler and Synchronous Rectifier
全桥倍流同步整流软开关变换器研究
15.
A Preliminary Study of "Gaodishu" Bamboo Slips Han Tomb no.1 in Xiejiaqiao
谢家桥一号汉墓《告地书》牍的初步考察
16.
Structure Type Selection during Preliminary Design of Kaifeng Yellow River Bridge at Arongqi-Shenzhen Expressway
阿深高速开封黄河大桥初步设计选型
17.
On dismantling steps of DXZ 32m/900t bridge fabrication machine and inspection methods
浅谈DXZ32m/900t造桥机拆除步骤及检算方法
18.
The vacuum mud jacking technology application in Dubu No.3 Bridge
真空压浆技术在杜步3号桥中的应用