1.
A Generating Algorithm for the Judgment Matrix in AHP Based on Pre-Ordering and Top Integral Function
基于预排序和上取整函数的AHP判断矩阵生成算法
2.
A device that sorts cards, data, or programs in a prearranged sequence
程序装置接预先排好的次序整理卡片、数据或程序的装置
3.
Parallel Machine Scheduling with Machine Release Times under Two Types of Information;
预知两种信息带准备时间的平行机半在线排序
4.
Qualification Appraisal for Construction Projects Based on Concentrated Ordering of Fuzzy Inputs;
基于模糊意见集中排序法的建筑工程资格预审
5.
A rank-based prediction algorithm of learning the intention of the query
一种基于排序学习的查询意图预测算法
6.
On-line Scheduling of Jobs with Order Arrival Time and Hard Deadline on Two Parallel Identical Machines
具有预约到达时间的平行机在线排序问题研究
7.
Research on the Material Assumed Forecasting and the Mixed-model Assembly Line Sequencing
ATO的物料需求预测与混流装配线排序研究
8.
9.1.3 Sorting Details
9.1.3 排序细节
9.
Undo\0Remove\0Sort Ascending\0Sort Descending
撤消\0删除\0升序排序\0降序排序
10.
Click Sort Ascending or Sort Descending.
单击“升序排序”或“降序排序”。
11.
To sort in ascending order, click Sort Ascending.
若要按升序排序,请单击“升序排序”。
12.
A computer program that effects some preliminary computation or organization.
一种实现某些预备性计算或组织编排的计算机程序。
13.
Demonstrated resourcefulness with ability to anticipate needs, prioritize responsibilities, take initiative and work independently.
具备预测需求,任务优先顺序排列,主动独立承担工作的全面能力。
14.
Some Problems in Scheduling Where Jobs Can Be Preprocessed and Semi-Hybrid Flowshop Problem;
工件可预处理排序中的若干问题和半杂交流水作业问题的研究
15.
A Special Model of on-line Scheduling on Three Related Machines with Total Processing Time Known in Advance;
预先知道总加工时间的一类特殊的三台平行同类机在线排序
16.
Formulating the Batch Scheduling in Semiconductor Burn-in Operations as a Mathematical Programming;
大规模集成电路预烧作业中分批排序问题的数学模型
17.
Semi-online Scheduling with Machine Cost;
预先知道工件最大加工时间的带机器费用的排序
18.
serial anticipation method
序列预测法 序列预度法