1.
caulk a pipe joint;caulked the cracks between the boards with mud.
堵住水管接头的缝隙;填塞木板和泥之间的缝
2.
WATER-PROOF PACKING GLAND FOR CONNECTING PIPE
接管式防水密封接头
3.
engine water outlet hose connection
发动机出水软管接头
4.
FLEXIBLE CONDUIT WITH WATER-PROOF PACKING GLAND
防水密封接头挠性管
5.
Connect the hose to the tap and turn on the tap.
把水管接在龙头上, 打开水龙头。
6.
Sweat tubing to adaptor before fitting adaptor to water connection.
在将热水器接头的转接头与水管系统连接之前,先把转接头焊接在水管系统上。
7.
4"H.T. Hose Connection which easily attaches to an outside hose bibb or to the drain connection on a water heater.
软管连接,容易连接到外置软管水龙头或热水器的排放接头。
8.
"Water connections in heater are 3/4"tapered pipe thread."
"热水器上的水连接管径都是3/4""锥管螺纹接头。 "
9.
joint for tube of asbestos-cement or cellulose fibre cement
石棉水泥或纤维素水泥制的管接头
10.
Asbestos-cement pressure pipes and joints for water
GB/T3039-1994石棉水泥输水管及其接头
11.
Connect the hose to the tap and turn on the water.
把水管接到龙头上,再把水打开。
12.
I attached the hose to the hydrant and watered the flowers in the garden.
我把水管接上水龙头,浇了园子里的花。
13.
Connect the hot and cold water lines to the installed nipples using unions.
采用管道接头将热水和冷水管道连接到热水器的热水和冷水的螺纹接头上。
14.
joint for tubing of asbestos (excl. of asbestos cement)
石棉管道接头(不包括石棉水泥制的)
15.
Winston knelt down and examined the angle-joint of the pipe.
温斯顿跪下来,查看水管的接头。
16.
open joint tile drainage pipe
不嵌接头缝的陶土排水管
17.
Head Loss Coefficients of Throttled Surge Tanks with the LinkingPipe;
有连接管的调压室水头损失系数研究
18.
Connect the hot water supply(3/4 NPT) to the fitting marked“ H”.
将热水管道(/NPT英寸)接到标注“H”的接头上。