说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 工厂生产能力
1.
This emerged by a comparison of plant capacity and output figures.
这一点只要将其工厂生产能力和产量数字比较一下就可以看出。
2.
Study on Capacity Improvement of Semiconductor Assembly and Test Factory;
半导体集成电路封装测试工厂生产能力提升研究
3.
I should think so. This plant can turn out 5, 000 units per month.
我想可以。该工厂月生产能力为5,000台。
4.
The factory churns out cars faster than the market could absorb them
这个工厂大量生产汽车,其速度之快超出了市场的吸收能力。
5.
Multi-objective production planning in multi-plant environment with uncertain demand and capacity;
不确定需求和能力约束下的多目标多工厂生产计划
6.
Factories are power plants where various fuels are burned and where the heat energy produced is converted into mechanical energy.
各种工厂都是动力厂,都是燃烧不同燃料、产生的热能变成机械能的场所。
7.
The factory will commence full scale operation next month.
工厂将于下月开始全力生产。
8.
ANALYSIS OF PRODUCTIVE CAPACITY AND SCHEME COMPARISON FOR DASHAN CONCENTRATOR;
大山选矿厂生产能力分析及方案比较
9.
Analysis of Annual Capacity of EAF Steel Plant with Continuous Casting Rate of 100 %;
全连铸电炉炼钢厂的年生产能力分析
10.
Using MES to Improve the Manufacture and Operation Capabilities in the Cement Plant
利用MES提高水泥厂生产和营运能力
11.
Based on standard production start-up curves, the mill would be at it's full 330,000 mt per year capacity by the end of 2006.
基于生产投产标准曲线,工厂将在2006年底前达到其最高生产能力33万吨/年。
12.
The factory cannot maintain current levels of production.
该工厂不能保持目前的生产水平.
13.
The plate mill will be equipped with an additional roughing stand which will increase the capacity of the plant to 1.8 million metric tons per year.
轧板机厂将装备一个额外的粗磨架,这将把工厂的生产能力提升到180万吨每年。
14.
Procurement and Production Decisions for an Assemble-to-Order Manufacturer with Limited Production Capacity;
有限能力按订单生产厂商的生产订购策略分析
15.
Teaching Factory in Singapore Improves Student s Comprehensive Abilities in Different ways;
“教学工厂”全面培养学生综合能力
16.
There are 150 officers and workers in the enterprise, the factory building area is 2500 square meter.
企业现有职工150人,工厂建筑面积4500平方米,我公司具有较强的技术力量和生产能力。
17.
Where there has been little effort to make the system work, the plant typically has shortages and misses delivery windows.
若工厂没有努力去实现拉动生产,就会出现部件投入不足和不能按照生产需要来搬运部件。
18.
Plant bottleneck analysis and execute equipment evaluation and updated plan, optimize productivity and production capacity.
工厂瓶颈分析,执行设备评估和更新计划,优化生产效率和提高生产能力。