1.
Remove seatback from vehiclIf necessary, refer to removal procedure.
从车辆上拆卸座椅背。视需要,请参阅拆卸程序。
2.
Research of Feasibility Checking for Disassembly Sequence and Simulation for Disassembly Process;
拆卸序列可行性检验及拆卸过程仿真的研究
3.
Remove battery, refer to the above procedures.
请参阅上述程序拆卸电瓶。
4.
Remove clock spring, refer to Group 8M Electrical for procedure.
拆卸计时弹簧,程序请参阅单元8M电。
5.
Disassembly sequence planning based on information table and disassembly tree for maintenance;
基于信息表和拆卸树的设备维修拆卸工序规划
6.
Research on disassembly model and disassembly sequence planning based on modularization
基于模块化的拆卸模型及拆卸序列规划研究
7.
For an operational description, diagnosis or removal/ installation procedures, refer to Group 14, Fuel Systems.
关于操作描述、诊断或拆卸/安装程序,请参阅单元14,燃烧系统。
8.
For service, refer to the Liftgate Outside Handle Removal/Installation procedure in this group.
关于维修,请参阅本单元升降闸门外侧手柄的拆卸/安装程序。
9.
Use this procedure if the entire cooling system is to be drained, such as for engine removal.
如果整个冷却系统要被排放则使用本程序,例如为了拆卸引擎。
10.
Research on the Technology of Product Disassembly Sequence Planning and Evaluation of Disassembly for Maintenance;
面向维修的产品拆卸序列规划及拆卸评估技术研究
11.
Reassemble the relief valve in the reverse order that it was disassembled.
按照拆卸的相反顺序重新组装安全阀。
12.
Re-assemble in the reverse order of disassembly
按照与拆卸相反的顺序重装
13.
Stripped Bonds and Stripped Coupons
拆卸债券及拆卸息票
14.
This paper studied the disassembling sieve in disassembly graph model systemically.
系统地研究了构造拆卸图模型过程中的可拆卸性筛子。
15.
Disassembling sieve based-on polychromatic sets has the advantages of higher formalization level and easily programming.
该研究结果保证了拆卸图模型和拆卸过程规划结果的正确性。
16.
Remove the blower motor and blower wheel unit from the heater-A/C housinSee Blower Motor in this group for the procedures.
从加热器-空调外壳拆卸鼓风马达和鼓风轮单元。程序见本单元之鼓风马达。
17.
Reverse the removal procedures to install.
按照与拆卸相反的过程安装。
18.
Install the push rods, rocker arms, pivots and bridges in the order they were remove
按照拆卸顺序安装推杆、摇臂、枢轴和桥臂。