1.
Building structure template parts and scaffold parts, buried foundry goods used under the railway crosstie, Znsulator iron cap of suspending form series and ring flange.
建筑用模板,脚手架配件,铁路预湿件,悬式绝缘子铁帽,铸铁法兰。
2.
Steel tube scaffold couplers
GB15831-1995钢管脚手架扣件
3.
Proper provisions must be made for the safe lifting of scaffold fittings, poles and boards.
必须使用合适的设备来安全提升脚手架的配件、柱和板材。
4.
Research of Property of the ADG Assembling Scaffold;
ADG装配式脚手架的应用性能研究
5.
Are scaffold components and planking in safe condition for use and is plank rated for scaffolds intended use?
脚手架组件和铺板处于安全的使用条件吗?脚手架铺板的额定负荷符合脚手架的拟定用途吗?
6.
Safety Analysis for Fasten-style Tubular Steel Scaffold and Bearing Frammework in the Building Construction;
扣件式脚手架及模板支架施工期安全性研究
7.
Where gin wheels/ pulleys( including ropes) or other accessories are fitted to the scaffold, these are to be included into the scope of all inspections mentioned in this procedure.
如果脚手架上装配辘轳/轮(括绳索)其它附件,这些设备都必须纳入本程序所述的所有检查范围。
8.
Research of the Method How to Write Special Safety Schemes for High-risk Scafold Project and the Development of Software;
危险性较大脚手架工程安全专项施工方案的编制方法研究及配套软件开发
9.
AN ANALYSIS OF THE EXPERIMENT IN JOINT-TYPES OF BUCKLE-TYPE STEEL TUBULAR SCAFFOLDING
扣件式钢管脚手架杆件接头型式试验分析初探
10.
Frame spacing and sill size capable of carrying intended loadings?
脚手架组件和铺板处于安全的使用条件吗?铺板的额定负荷适合脚手架的用途吗?
11.
Reinforcement on steel tubular scaffold with couplers of the super-think roof and high wall
超厚顶板和高大墙体的扣件式钢管脚手架加固
12.
ANSYS-BASED ANALYSIS ON WHOLE STABLE LOAD-BEARING CAPACITY OF STEEL TUBULAR SCAFFOLD WITH COUPLERS
用ANSYS分析扣件式钢管脚手架整体稳定承载力
13.
Bracing design and construction of form of steel pipe scaffold with overhanging fastener
悬挑扣件式钢管脚手架模板支撑的设计与施工
14.
Construction technology measures of large area buckle type steel pipe scaffolding
高层大面积扣件式钢管脚手架施工技术措施
15.
T45II equips all kinds of interchangeable components, including hanging bookshelf, hanging cabinet and panel leg.
T45II配备各种可转换的配件,包括悬挂式书架,悬挂式书柜和桌脚。
16.
A semi-rigid node calculation method for steel tubular scaffold with complete based on back-analysis of scaffold load-bearing experiments results
基于整架试验的扣件式钢管脚手架半刚性节点计算方法
17.
Toe boards are to be of wood construction, aluminum, or steel preformed to match the scaffold.
隔板必须是与脚手架匹配的预制木材、材或钢材结构。
18.
scaffold and hoist equipments
脚手架和垂直升降设备