说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 装船前
1.
The shipment was weighed before loading.
这批货的装船前都已过磅,
2.
The seller have to Inspect the goods before shipment .
装船前,卖方须对货物进行检验。
3.
The credit line should be opened one month before the time of shipment.
信用证必须在装船前一个月办理。
4.
Damage to the machine is due to violent bumping before shipment.
机器的损坏是装船前剧烈碰撞造成的。”
5.
the L/C should reach us 30 days before the month of shipment,
信用证应在装船前30天开到我处。
6.
The L/C must reach us 30 days before shipment.
信用证必须在装船前30天开到我处。
7.
Damage to the machine is due to violent bumping before loading.
机器受损是由于装船前猛烈碰撞造成的。
8.
I am afraid it 'll be difficult for us to advance the time for shipment .
恐怕我方难以提前装船。
9.
We'll try our best to advance the shipment.
我们将尽力提前装船。
10.
The ship will victual before sailing.
船于航行前先装贮食物。
11.
The Analysis of the Current Large-Containership Newbuilding Market;
当前大型集装箱船新船建造市场分析
12.
someone who sculls (moves a long oar pivoted on the back of the boat to propel the boat forward).
摇桨(摇动装在船尾的长橹来使船向前推进)的人。
13.
Earlier shipment now possible if required
如有必要,现在就可提前装船。
14.
The goods vehicles had rolled off by Saturday.
星期六前货物集装箱已被卸下了船。
15.
The freighter carrying pig iron is cleaving through the water.
装着生铁的货船正在破浪前进。
16.
We will do our best to advance shipment but cannot commit ourselves.
我们一定尽力提前装船,但不能保证。
17.
Please establish the L/C... days before the prescribed time of shipment.
请在规定的装船期前...天开出信用证。
18.
Finite Element Analysis of Fore Mast for 1700TEU Container Vessel
1700TEU集装箱船前桅结构的有限元分析