1.
less than a full container loadfull container load
拼箱货但整箱交货责任
2.
FCL to LCL Delivery
整箱货改为拼箱货交接
3.
FCL Cargo ReceivedDelivery As FCL Cargo
拼箱货改整箱货交接
4.
LCL Delivered at Port of Called
中途港站拼箱货交接
5.
The Research on Freezing Less Container Load Transportation of Dalian-Japan Line;
大连—日本航线冷藏集装箱拼箱运输的探讨
6.
Each succeeding fabricated box is erected on trolleys.
每段预拼的箱梁安装在小平车上。
7.
They knocked together a rough box with wooden boards.
他们用木板拼成一个粗糙的箱子。
8.
FLEXURAL BEHAVIOR OF FRP PROFILE ASSEMBLED BOX BEAM
FRP型材拼装箱梁的受力性能研究
9.
He made a meal of the odds and ends that were left in the refrigerator.
她将放在冰箱里的一些残余食物拼凑成一餐饭。
10.
Some suggestions of cantilever installation of steel box shaped girder are given.
对悬拼法钢箱梁安装提出了一些有益的建议。
11.
Study on Construction Technology of Box Girder Segment s Stub Matching Precast and Cantilever Erection;
箱梁短线匹配预制及悬臂拼装施工技术研究
12.
Research on Mechanical Performance of 300 Metres Span RC Arch Bridge with Cableway and Cantilever Erection;
300米跨缆吊悬拼施工RC箱型拱桥受力性能研究
13.
Research on Construction Controlling of Reinforced Concrete Arch Bridge with Precast Segmental Cantilever;
悬拼钢筋混凝土箱型拱桥施工控制的研究
14.
Long-span prestressed box girder precasting,cantilever assembly construction and quota analysis thereof;
大跨度预应力箱梁预制悬拼施工及定额分析
15.
Construction,assembly and cost analysis of bridging machine for large span prestressed box girder erection;
大跨度预应力箱梁架桥机构造拼装与造价分析
16.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
17.
Construction technology of box-girder segment bricolage of traversing carriage bridge fabrication machine
移动支架造桥机箱梁节段拼装施工技术
18.
The research on method of geometry-control during erection of the short-line bridge
基于几何控制法的短线预制拼装箱梁研究