1.
Ulu Pandan Refuse Incineration Plant
乌鲁班丹垃圾焚化厂
2.
Optimized Research of Municipal Solid Waste Incineration Plant Location;
城市生活垃圾焚烧发电厂选址优化研究
3.
Flue Gas Cleaning System and Relevant Standards of MSW Incineration Plants
城市生活垃圾焚烧厂烟气净化系统及标准分析
4.
Study on the Treatment Processes for Landfill and Incineration Plant Leachates;
垃圾填埋场和垃圾焚烧厂渗滤液处理工艺研究
5.
Discussion on refuse pretreatment technique for refuse incineration power plants
垃圾焚烧电厂垃圾预处理工艺设计探讨
6.
Guangzhou Likeng Waste-to-energy Power Plant;
《案例》:广州市李坑生活垃圾焚烧发电厂
7.
Research on Lixivious Toxicity of Fly Ash from Municipal Solid Waste Incineration to Energy Plant;
垃圾焚烧发电厂飞灰浸出毒性的研究
8.
Design of Centralized Control System for WTE Power Plant
垃圾焚烧发电厂集中控制系统的设计
9.
Seismic response of main building structure of refuse incinerating power plant
垃圾焚烧工程主厂房的地震反应分析
10.
Design of Treatment Engineering of Leachate from Waste Incineration Power Plant
垃圾焚烧发电厂渗滤液处理工程设计
11.
Study on Physicochemical Technology and Its Mechanism for Treating the Leachate from MSW Incineration Cite;
生活垃圾焚烧厂渗滤液物化处理的工艺与机理研究
12.
Such projects as Gao'antun Garbage Burning Plant and Jiaojiapo Garbage Burying Ground will be completed.
建成高安屯垃圾焚烧厂、焦家坡垃圾填埋厂等工程。
13.
Discussion on the Urban Consumer Waste Incineration Power Plants General Layout of Site Area in the Future
城市生活垃圾焚烧发电厂厂区总布置探讨
14.
Research on Biotechnologial Treatment of Leachate from Refuse Dump in Municipal Solid Waste Incineration Plant;
城市垃圾焚烧厂垃圾储坑渗滤液生物处理技术研究
15.
Study on Water Quality of Leachate from Garbage Landfill Site and Garbage Incineration Plant in Chongqing s Main City Zone;
重庆市主城区垃圾焚烧厂和垃圾填埋场渗滤液水质研究
16.
Discussion on waste pretreatment system design of city municipal solid waste incineration power plant
城市生活垃圾焚烧发电厂的垃圾前处理系统的设计
17.
Compound Stabilization of MSW Incineration Fly Ash with Copperas and Cement;
垃圾焚烧飞灰的复合稳定化/固化研究
18.
Research on Solidification/Stabilization of MSWI Fly Ash in Alkaline Slag;
垃圾焚烧飞灰碱矿渣固化稳定化研究