1.
REVAMP OF DOUBLE BELL CHARGING MECHANISM IN PANZHIHUA IRON & STEEL CORP. FOR LONG SERVICE LIFE
攀钢双钟炉顶装料设备长寿化的改造
2.
bell charging equipment
料钟装料设备(高炉)
3.
Constant modifications to the bell less top equipment results in quite well effect in blast furnace smelting.
通过对无料钟炉顶设备的不断改进 ,高炉冶炼取得了较好的效果。
4.
Installation of bell-less top steel ring for blast furnace
炼铁高炉无料钟炉顶钢圈的安装技术
5.
Brief Introduction of a New Digital Ball-type Charging Throttle Valve in Bell-less Top Equipment
无料钟炉顶设备中一种新型球式数字缸料流调节阀的简介
6.
However, the distributing ring of furnace throat is the most simple auxiliary charging device for distribution control.
炉喉布料挡圈是一种控制布料最简便的辅助装料设备。
7.
Constructing Practice of Changing Top Equipment and Coating Inner Wall of Blast Furnace At The Same Time
高炉炉顶设备更换与炉内喷涂同时施工的实践
8.
Technology and Equipment Features of Kalujin Top Combustion Hot Air Stove on No.3 Blast Furnace in Honghe Iron & Steel Co.
红钢3号高炉Kalujin顶燃式热风炉技术装备特点
9.
The roof has been fireproofed.
这个屋顶装有防火设备。
10.
Study and Design of Blast Furnace Top Gas Pressure Control System in TRT;
TRT装置高炉顶压控制系统研究与设计
11.
DESIGN AND OPERATION OF BELL-LESS TOP OF No.1 BLAST FURNACE AT MEISHAN
梅山1号高炉无料钟炉顶的设计与使用
12.
Installation of bottom equipment of stepping girder furnace;
浅谈步进梁式加热炉炉底设备的安装
13.
CHARACTERISTICS OF KALUGIN TOP COMBUSTION HOT BLAST STOVE AND TECHNICAL ANALYSIS
卡鲁金顶燃式热风炉的装备特点与技术分析
14.
laboratory machinery and apparatus (excl. of ceramics or glass), for the heat treatment or cooling of materials (excl. furnaces and ovens)
实验室设备和装置(不包括陶瓷和玻璃的),对材料进行热处理或冷却用(不包括熔炉和烘炉)
15.
Iron ore, coke, and limestone are put into the top of the furnace. These are called "charge".
铁矿石、焦碳、石灰石装进炉子的顶部。这些东西叫炉料。
16.
Summary on the Installation Technology of Hearth Mechanical Equipment of Walking Beam Furnace
浅谈步进式加热炉炉底机械设备安装技术
17.
automated material handling equipment
自动装卸材料的设备
18.
Optimization of Thailand 750m~3 Blast Furnace the Equipments Installation & Construction;
泰国750m~3高炉设备安装与施工的优化