1.
Numerical Simulation of the Process of Vertical and Directional Solidification of Large-size Steel Ingot;
大型垂直定向凝固钢锭凝固过程数值模拟
2.
Numerical Simulation for Temperature Field of Forging Ingot Solidification Process and Application;
锻造用钢锭凝固过程温度场数值模拟及其应用
3.
Influence of ESR Process Parameters on Solidification Quality of Remelting Ingots
电渣重熔工艺参数对钢锭凝固质量的影响
4.
Numerical Simulation of Temperature and Thermal Stress Field in Steel Ingot Solidification Process and Application;
锻造用钢锭凝固过程温度场、应力场的数值模拟及其应用
5.
According to the calculation of interface energy as well as the flow analysis based on gravity, it is claimed that the inclusions distribution was affected by the travel of the excessive[ H] during solidification.
采用相间能计算和重力流动分析得知,此分布规律是过量[]钢锭凝固过程中的运动促成的。
6.
THERMAL STUDY ON THE STEEL SOLIDIFICATION PROCESS IN THE HOT-TOP OF 610 TYPE INGOT MOULD
610型镇静钢锭帽口凝固过程的热工研究
7.
Coupled Numerical Simulation of Solidification Transport Behaviours in Electromagnetic Continuous Casting of Steel Ingots;
电磁场下钢锭连铸凝固传输行为耦合数值模拟
8.
In the case of rimming steel, no or some deoxidation is carried out before casting. During the solidification in the mould carbon monoxide is formed and the gas makes the steel boils.
沸腾钢在铸锭前不脱氧或轻度脱氧。在锭模中凝固的过程中产生的一氧化碳气体使钢液沸腾。
9.
During the solidification in the mould carbon monoxide is formed and the gas makes the steel boils.
在锭模中凝固的过程中产生的一氧化碳气体使钢液沸腾。
10.
Numerical Simulation of Solidification Structure Formation of TiAl Alloy Ingots;
TiAl合金锭凝固组织形成的数值模拟
11.
Microstructure and Solidification Simulation of Φ480 ZK60 Mg Alloys Cast Ingot;
工业态Φ480ZK60镁合金铸锭组织研究及凝固模拟
12.
Directional Solidification of TiAl-Based Alloys Billets with Cold Crucible;
钛铝基合金扁锭冷坩埚定向凝固工艺研究
13.
Diretional Solidification of TiAl Alloy Containing Nb, RE and Si Billet by Cold Crucible
含Nb,RE及Si的TiAl合金方锭的冷坩埚定向凝固
14.
Effects of Ultrasonic Power on Solidification Structure in AZ31B Alloy Ingots
超声振动功率对AZ31B镁合金铸锭凝固组织的影响
15.
Modelling of macrosegregation in large steel ingot with considering solid movement
考虑固相移动的大尺寸钢锭宏观偏析数值模拟
16.
mould setting-and-stripping bay
钢锭模准备和脱锭跨
17.
We should first sink in the steel wire before the concrete sets.
在混凝土凝土凝固前必须先插上钢筋。
18.
That concrete is reinforced with steal beams.
混凝土中又用钢筋加固。