说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 井架设计
1.
Design Checking and Optimization of the JJ450/45-K Derrick
JJ450/45-K井架设计校核及优化
2.
REALIZATION OF THE EXPERT SYSTEM OF MULTIPLE-ROPE STEEL HEADFRAME DESIGN
《多绳落地钢井架设计专家系统》软件的实现
3.
The Designing of Observing Zhangbei s Chief Mine s Headframe s Base s Subsidence and Deformation;
张北主井井架基础沉降及变形观测设计
4.
Centrolized Control System of Underground Overhead Manned Cart
煤矿井下架空人车集中控制系统设计
5.
VC++ based on the Carrying Capacity of the Derrick Design Assessment Procedures
基于VC++的井架承载能力评估程序设计
6.
Design of Test-bench System for Logging Tools Based on Embedded Structures
基于嵌入式架构的测井仪器调试台架系统设计
7.
Design rig's mast structure& rig's substructure.
油井的钻机的井架,珩架及底座结构件的应力分析和设计。
8.
DESIGN AND CALCULATION OF THE CLIP OF THE POWER MOTOR TEST STAND USED IN THE WELL
井底动力马达试验台架夹紧钳的设计和计算
9.
Design and calculation of the clip of the screw rod motor test stand used in the well
井底螺杆马达试验台架夹紧钳的设计和计算
10.
Design on Underground Host Computer of Electro and Hydraulic Control System for Hydraulic Powered Supports in Fully Mechanized Coal Mining Face
综采面液压支架电液控制系统井下主机的设计
11.
Design of Framework for Decoding Logging Data Format and Realization of Decoding LAS under the Framework;
测井数据格式解编框架设计及应用该框架实现LAS数据格式解编
12.
Optimization Analysis for Truss Overhead Crossing Design of Zhijing River Gas Transmission Pipeline
巴东支井河输气管道桁架跨越结构的优化设计分析
13.
Code for design of inclined shaft and chambers of coal mine
煤矿矿井斜井井筒及硐室设计规范
14.
660m depthdrilling shaft lining structure design and analysis of main shaft Ban Ji mine
板集主井660m深钻井井壁结构设计分析
15.
Design Optimization of Drilled Shaft Lining Structure in 1000m Deep Shaft
千米深井钻井法凿井井壁结构设计优化
16.
computerized well planning program
计算机钻井设计程序
17.
Two existing mast structures are computed with the planned program and compared with the orignal design.
文后根据所编制的程序计算了两个工程实际井架,并与原设计方案进行了比较。
18.
Calculation and Analysis of the Derrick and Mobile Shelf of the Whelled Hoist Tractor;
轮式作业机井架和车架强度计算和分析