1.
For coal bin, a coal arch breaker can be installed at its outlet or hyperbola wall coal bin be used.
对于煤仓,可在其出口处设置破拱装置或采用双曲线壁煤仓。
2.
Specification and type for conventional domed metallic bursting discs
GB/T14566-1993正拱形金属爆破片型式与参数
3.
Specification and type for reverse domed metallic bursting discs
GB/T14567-1993反拱形金属爆破片型式与参数
4.
Specification for domed metallic bursting discs
GB567-1989拱形金属爆破片技术条件
5.
Research on the Damage of Hangers of Concrete-Filled Steel Tubular Arch Bridges;
钢管混凝土拱桥吊杆的破损行为分析
6.
Analysis of Failure-safety of Arch Bridge with Different Disposal of Suspenders
吊杆布置对拱桥破损安全性能的影响
7.
Analysis of Destruction Modes of Surrounding Rock of Permeable Tunnel with Ribbed Arch Beam
通透肋式拱梁隧道围岩破坏模式分析
8.
Classification and mounting dimensions for domed metal bursting disc devices
GB/T12353-1990拱型金属爆破片装置分类与安装尺寸
9.
Three Dimensional Finite Element Analysis for the Failure Process of a Reinforced Concrete Arch Structure;
钢筋混凝土拱结构破坏过程的三维有限元分析
10.
Study on Application of Concrete Plug during Treating Dam Foundations in the Fractured Zone in Fault;
传力洞在处理拱坝软弱破碎带基础中的应用
11.
Experriment Research on Failure Mechanism and Work Mechanism of Arch Invert Cushion Pool;
反拱水垫塘破坏机理和工作机理的试验研究
12.
Application of the smooth blasting on the transparent ribbeam tunnel excavation
光面爆破在通透肋式拱梁隧道开挖中的应用
13.
Research on seismic failure pattern of arch dam with contraction joints by shaking table tests and numerical analysis
带横缝拱坝地震破坏机理的振动台试验研究
14.
Damage and fracture analysis of Dagangshan arch dam under strong earthquake
大岗山高拱坝强地震作用下损伤破坏分析
15.
Replacement and Excavation of High Arch Dam in Weak Fractured Zone
水电站高拱坝软弱破碎带地层的置换加固技术
16.
EXPERIMENTAL STUDY AND NUMERICAL SIMULATION FOR SEISMIC FAILURE OF HIGH ARCH DAM ON SHAKING TABLE
高拱坝振动台地震破坏试验研究及数值仿真
17.
A Numerical Analysis of Explosion Vibration Function on Single-Arch Tunnel Structure
爆破震动对单拱隧道结构的作用数值分析
18.
"Before the arch, Builders were handicapped by the tendency of stone to Break under its own weight."
在拱之前,建筑者皆受限于石头于其本身重量下有破碎倾向之现象。