1.
Analysis on the Dam Bypass Seepage on Right-bank in the Dam Site of Songta Hydropower Station
松塔水电站坝址区右岸绕坝渗漏分析
2.
Study of Rock Mass Structural and Assessment of Stability of BaShan-dam;
巴山坝址区岩体结构研究与坝体稳定性分析
3.
Engineering Geological Condition of Buxi Hydropower Station's Dam Site and Discussion on Dam Type
布西水电站坝址工程地质条件及坝型论证
4.
TWO-STAGE ANALYSIS OF INITIAL GEOSTRESS FIELD AT DAM SITE ZONE OF HIGH ARCH DAM
高拱坝坝址区初始地应力场的二次计算
5.
Selection of Dam Type and Damsite for Dayakou Hydropower Station on Nanpeng River in Zhengkang County
镇康县南捧河大丫口水电站坝址坝型选择探讨
6.
The Archeological Findings of and Thoughts on Zhong Baodao Ancient Site;
三峡坝址中堡岛古遗址考古发掘及初略认识
7.
A Study on the Suitability of Building the High Rockfill Dam in the Underside Dam Site of the Changheba Hydroelectric Station in Daduhe River;
大渡河长河坝水电站下坝址建高(堆石)坝适宜性研究
8.
The Primary Study of Concrete Gravity Dam Type Comparison in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Jike dam site
西线一期工程混凝土重力坝坝型比较初步研究——以纪柯坝址为例
9.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
10.
The Study of Dam Type Comparison Between Concrete Faced Rock-Filled Dam and Embankment Dam with an Asphaltic Concrete Core in first Stage of the Western Route Water-Transfer Project--Dam type comparison at Renda dam site
西线一期工程混凝土面板坝与沥青心墙坝坝型比较研究——以仁达坝址为例
11.
The Study of Dam Type Comparison Between Concrete Arch Dam and Concrete Faced Rock-Filled Dam in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Reba dam site
西线一期工程混凝土拱坝与混凝土面板堆石坝坝型比较研究——以热巴坝址为例
12.
The Study of Dam Type Comparison between Concrete Faced Rock-Filled Dam and Embankment Dam with a Clay Core in First Stage of the Western Route Water-Transfer Project--Dam type comparison at Zhaluo dam site
西线一期工程混凝土面板坝与黏土心墙坝坝型比较研究——以扎洛坝址为例
13.
Physical features at the site must be ascertained in order to make a sketch of the dam.
坝址处的自然条件必须查明,以便绘出坝的示意图。
14.
The Research on Engineering Flexibility of Longpan Dam Region of Tiger Leaping Gorge Hydroelectric in Jingsha River;
金沙江虎跳峡水电站龙蟠坝址区建坝条件的工程适宜性研究
15.
Study on the Engineering Geological Property of Deep Overburden in the Qizong Hydroelectric Power Station, Jinsha River
金沙江其宗水电站下坝址坝基深厚覆盖层工程地质研究
16.
Analysis of Stress and Strain Characteristic of Site Slope at Gaixia Hydroelectric Dam in Yunyang City of Chongqing
重庆云阳盖下坝水电站坝址边坡应力应变特征分析
17.
FEASIBILITY STUDY ON CONSTRUCTION OF HIGH DAM AT MIDDLE REACHES OF JINSHA RIVER WITH THICK RIVERBED DEPOSIT
金沙江中游上江坝址河床深厚覆盖层建高坝可行性探讨
18.
Hydrogeological Characteristcs of Shangjiang Dam Area in Jinsha River and Discussion on Its Influence to Dam Anti-seepage
金沙江上江坝址水文地质特征及对大坝防渗影响的探讨