说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 全断面岩石掘进机
1.
Study on the Consecutive Boring Principle of the Open Type Full Face Rock Tunnel Boring Machine;
敞开式全断面岩石掘进机连续掘进原理的研究
2.
Investigation of rock cutting mechanism of disc cutter of fullface development machine
全断面岩石掘进机盘形滚刀破岩机理的探讨
3.
Improvement on Material Conveying System of Model TB880E Full-face Rock TBM
TB880E型全断面岩石掘进机材料运输系统的改进
4.
Study on thrust-anticipating calculation of the disc cutter of TBM
全断面岩石掘进机盘形滚刀推力预测计算研究
5.
Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全断面岩石掘进机盘形滚刀布置规律的研究
6.
Development of Management Software of Disc Cutter in Full-section Rock TBM
全断面岩石掘进机盘形滚刀管理软件开发
7.
Study on the Continuous Boring Control System of Open Type Full Face Rock Tunnel Boring Machine;
连续掘进敞开式全断面岩石掘进机控制系统的研究
8.
Analytic Solution and It's Usage of Arc Length of Rock Breakage Point of Disc Edge on Full Face Rock Tunnel Boring Machine
全断面岩石掘进机盘形滚刀刃破岩点弧长的解析解及应用研究
9.
The Development of Forecasting Software for Host Parameter of TBM and Construction Technical Parameter;
全断面岩石掘进机主参数及施工技术参数预测软件的开发
10.
The Research on Theory and Techniques of Service Life Management of TBM Disc Cutters;
全断面岩石掘进机盘形滚刀寿命管理理论及技术研究
11.
The Predicted Research on Life and Management Software Development of TBM Disc Cutters
全断面岩石掘进机盘形滚刀寿命预测及管理软件开发
12.
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全断面岩石隧道掘进机刀盘刀具布置方法研究
13.
Study on Drive System of the Full-face Rock Tunnel Boring Machine;
全断面硬岩掘进机(TBM)驱动系统的研究
14.
Research and Application of Refit Technology of All-Section Rock Tunnel Boring Machine
全断面硬岩掘进机全面整修技术研究与应用
15.
On Measures to Overcome Difficult Encountered in Weak Stratum during Construction Stage of Tunnel Built by Double-shield Tunnel Boring Machine
双护盾全断面掘进机(TBM)遇软岩洞段的解困方案
16.
Application Research of Shield Tunnel Boring Machine on Soft and Hard Rock Engineering in Osaka Tunnel
双护盾全断面掘进机在大坂隧洞软硬岩工程中的应用研究
17.
pattern recognition of full face TBM boring performance
全断面隧道掘进机掘进状况分类识别研究
18.
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;
秦岭隧道全断面掘进机掘进状况识别分析研究