1.
Discussion on Eliminating the Hidden Dangers in Coal Smashing inside the Coal Tower--Research on the Application of Air Bubblein the Coke Oven Operation
试论消除煤塔内捣煤隐患——空气炮在焦炉生产过程中的应用与研究
2.
Application of the Technology of Spraying Concrete to Remaking and Reinforcing Coal - towers;
喷射混凝土技术在煤塔改造加固中的应用
3.
Analysis on the error- correcting of three-dimensional earthquake data and its precautionary measures in the Tashan mine of Datong Coal Mining Group
同煤塔山矿三维地震资料纠错分析与预防措施
4.
DESIGN OF THE LARGE-SCALE STEEL STRUCTURAL COAL TOWER AND RESEARCH OF COMPLEX JOINT
某大型钢框架煤塔复杂节点设计和分析
5.
Key Technologies on Fully Mechanized Top Coal Caving Mining of Ultra Thick Seam in Tashan Mine
塔山煤矿特厚煤层综放开采关键技术
6.
Study on the characteristics and variation regulations of coal quality in A'ai mining area of Tabei coalfield
塔北煤田阿艾煤矿区煤质特征及其变化规律
7.
Coal characteristics and utilization access of Jurassic coal in Bulianta Mine
补连塔矿侏罗纪煤的煤质特征与利用途径
8.
Practices on Fully Mechanized Longwall Top Coal Caving Mining Technology in Extra Thick Seam in Tashan Mine
塔山煤矿特厚煤层安全高效综放开采技术
9.
Coal quality characteristics of carboniferous-permian coal seams of Tashan Mining Area
塔山矿区石炭二叠纪煤层煤质特性研究
10.
ONE-TOWER DESULFURIZATION OF COG
鞍钢——塔式焦炉煤气脱硫脱氰技术(摘要)
11.
Research on Optimization of Blasting Parameters in Majiata Opencast Mine
马家塔露天煤矿爆破参数优化的研究
12.
An Analysis of Industry Tourism Resources Exploiting in Mine Areas --Taking Daliuta Colliery in Shaanxi Province as an Example;
煤矿区工业旅游资源开发探讨——以陕西神木县大柳塔煤矿为例
13.
Analysis of Logging Curve Characteristics of Coal Seam Scoured by Paleo-river in Tar Coalfield,Pakistan
巴基斯坦塔尔煤田古河流冲刷煤层的测井曲线分析
14.
The Blasting Parameters Testing and Researching in the Ma Jiata Opencast Mine of Rock Blasting;
马家塔露天煤矿岩层爆破参数试验研究
15.
Numerical Simulation Research of Rapid Quenching Tower of Coal Topping Pilot-Scale Experimental Apparatus;
煤拔头中试实验台急冷塔的数值模拟研究
16.
Application of centralized automation controlling system in washing plant of Bulianta;
集中自动化控制系统在补连塔洗煤厂的应用
17.
The Construction Methods of the Outside Tube Wall withφ17.80M under the Tower Shaft in Dragon Mine
龙家堡煤矿主井井塔筒形基础施工方法
18.
On the Derrick Installation of ShaftⅣ_G In main Shaft of a Coalmine
浅谈塔然高勒煤矿主井IV_G凿井井架安装