1.
ANALYSIS OF EFFICIENT OPERATION OF LIMESTONE-GYPSUM DESULFURATION SYSTEM
石灰石-石膏湿法吸收系统高效运行的分析
2.
INFLUENCE OF SMOKE CONCENTRATION UPON ABSORPTION TOWER IN WET DESULPHURATION SYSTEM AND COUNTERMEASURES THEREOF
烟尘浓度对湿法脱硫吸收塔的影响及对策
3.
Absorption of Fluorinated Compound in Tail Gas of Wet-process Phosphoric Acid Product with Ammonia
氨水吸收湿法磷酸生产尾气中氟化合物的初探
4.
infrared absorption hygrometer
红外吸收湿度测定仪
5.
infrared absorption spectra hygrometer
红外吸收光谱湿度计
6.
The cedar lining will absorb too much moisture, and it cannot absorb any more moisture while storing cigars. The humidor may grow mold because of excess moisture.
第一:因保湿盒会因直接擦拭而吸水过多﹐以杉木无法再吸收过剩的水份﹐致盒内太潮湿而发霉。
7.
The indirect determination of trace chlorine content(0.001%~0.01%)in WPA by atomic absorption spectrophotometric method is described.
介绍原子吸收分光光度法间接测定湿法磷酸中微量氯(0.001%~0.01%)。
8.
Determination of Total Tmounts of Chromium in Plastic Samples by Atomic Absorption Spectrometry-Wet Decomposition
湿法消解-火焰原子吸收分光光度法测定塑料制品中的总铬
9.
Determination of Seven Elements in Coal by Wet Digestion-FAAS
湿法消解-火焰原子吸收分光光度法测定煤中七种元素含量
10.
Readily absorbing moisture, as from the atmosphere.
易湿的,吸湿的容易吸收水分,比如大气中的水分
11.
testing method for water absorption : dynamic method
吸湿性能测试法:动态法
12.
Study on Diesel Exhaust Gas Wet Purification with Attapulgite Clay Absorbent
凹凸棒石粘土吸收剂湿法净化柴油机废气的研究
13.
Numerical Calculation and Optimization of Flow Field Inside the Compound Liquid Column Wet Processes Absorber of Desulphurization;
湿法脱硫复合式液柱吸收塔内过程数值模拟及优化
14.
Research on Wet Desulfurization System Operating & Aborbent Optimize;
湿法石灰石烟气脱硫系统运行及其吸收剂优化的研究
15.
TEST STUDY ON RELATIONSHIP BETWEEN DESULFURIZATION EFFICIENCY OF WET LIMESTONE METHOD AND pH VALUE OF ABSORBENT SLURRY
湿式石灰石法脱硫效率与吸收剂浆液pH值关系的试验研究
16.
Analysis of two nickel-based alloys used in absorber of wet flue gas desulphurization in coal-fired power plant
燃煤电厂湿法烟气脱硫吸收塔镍基合金材料国产化可行性分析
17.
Present situation of research on Absorbent for NO_x removal in WFGD system
湿法同时脱硫脱硝工艺中脱硝吸收剂的研究现状
18.
SIMULATION OF FLUE GAS FLOW FIELD IN ABSORPTION TOWER WITH DOUBLE INLETS FOR WET FLUE GAS DESULPHURIZATION OF 600MW UNIT
660MW机组湿法烟气脱硫双入口吸收塔内烟气流场模拟