1.
Second Mining under Isolated Pillar Left by Wedge-pillar Mining Method
刀柱复采跨隔离煤柱布置探索与实践
2.
Research on Longwall Rigid Separating Pillar Mining Technology of Small Colliery in YSF Field;
榆神府矿区小煤矿长壁布置刚性隔离煤柱房柱式开采研究
3.
cage,for ball, roller or needle roller bearing
滚珠、滚柱或滚针轴承隔离圈
4.
Numerical Modeling on Fluid-Solid Coupling for the Waterproof Coal Pillar Design
流-固耦合作用下防隔水煤柱留设的数值模拟
5.
Strike Coal Pillar Affected to Strata Pressure of Fully Mechanized Longwall Mining Face with High Cutting Height in Closed Distance Seam
走向煤柱对近距离煤层大采高综采面矿压影响
6.
Isolation of plane SV waves by discontinuous barriers composed of several rows of cylindrical cavities
多排柱腔构成的非连续屏障对SV波的隔离
7.
Stability Analysis on-693m Level Insulating Pillar of Deep Excavation of Chambishi Copper Mine
谦比希深部开拓-693m水平隔离矿柱的稳定性分析
8.
go into [come out of] quarantine
被隔离 [解除隔离]
9.
Research on Application of Safety Isolation and Coal Mine Multi-Service Access;
基于安全隔离的煤矿多业务接入应用研究
10.
A research on coal pillar stability in the upper Wangeviry gob area in contiguous coal seams
近距离煤层采动上部旺采区煤柱稳定性实测研究
11.
Separate the lower A-pillar cowl trim from the A-pillar lower cowl.
从A-柱下部前隔板上拆下下部A-柱前隔板。
12.
Study on Longwall Mining Pressure and Control Beneath the Area Mined with Longwall-Pillar Method in Ultra-Close Multiple-Seams;
极近距离煤层刀柱采空区下长壁开采矿山压力及其控制研究
13.
Analysis on Ground Subsidence Control Mining Plan with Grouting in Overburden Separated Strata above Coal Pillar Under Railway Line in Tangshan Mine
唐山矿铁路煤柱覆岩离层注浆减沉开采方案分析
14.
To separate or keep apart.
隔开隔开或保持距离
15.
open hole single packer test string
裸眼单封隔器测试管柱
16.
an interval of five metres between columns
柱子间的间隔是五米
17.
inflatable packer test string
胶囊封隔器测试管柱
18.
having a series of columns arranged at regular intervals.
拥有一连串的每隔一定间隔的圆柱。