1.
On selection between beam anchor column and column anchor beam in frame beam-column joint construction
框架梁柱节点施工中梁锚柱与柱锚梁方式选择
2.
Coal Way Support Technology with Bolt Supported Steel Net and Large Steel Rope;
浅析锚梁网、锚索支护技术在煤巷中的应用
3.
Practice of the Timbering of Composite Top - Tray Drift Anchored Cable Ret Cord
复合顶板沿空巷道锚梁网索支护实践
4.
Synthesis Picks Cuts Eye Anchor Beam net Timbering Engineering Research and Practice
综采切眼锚梁网支护技术研究与实践
5.
Construction Techniques of Rockbolting Beam in Underground Powerhouse at Baoxing Hydropower Station
宝兴水电站地下厂房岩锚梁施工技术
6.
Application of epoxy anchoring agent during anchorage fixing of bridge cables
环氧锚固剂在桥梁缆索锚具锚固中的应用
7.
A beam projecting outward from the bow of a ship and used as a support to lift the anchor.
锚架从船头伸出的作为提升锚的支架的横梁
8.
Study on the Reasonable Pattern of Cable-Girder Anchorage for Steel Cable-Stayed Bridge
钢斜拉桥锚箱式索梁锚固区合理构造型式研究
9.
Analysis on the Application of Bolt-Mesh-Beam+Anchor Rope Combined Support Technology in Coal Mine
浅析锚—网—梁+锚索联合支护技术在矿井中的应用
10.
Research on Main Cable Anchorage Structure of Self-Anchored Suspension Bridges with Steel Box Girders
自锚式钢箱梁悬索桥主缆锚固结构研究
11.
Finite Element Analysis of Cable-Girder Anchorage Zone for Cable-Stayed Bridge with Steel Anchor Box
钢锚箱式索梁锚固区段有限元仿真分析
12.
STRESS ANALYSIS OF ANCHORAGE ZONE OF CABLE-GIRDER STEEL ANCHOR BOX FOR MINPU BRIDGE Ⅱ IN SHANGHAI
上海闵浦二桥索梁钢锚箱锚固区应力分析
13.
Reliability analysis for anchorage of reinforced concrete beam with corrosion-induced longitudinal crack in anchorage zone
锚固区锈胀开裂钢筋混凝土梁锚固可靠度分析
14.
EXPERIMENTAL STUDY ON ANCHOR-PLATE ANCHORAGE FOR CABLE-STAYED BRIDGES WITH STEEL BOX GIRDER
钢箱梁斜拉桥锚拉板式索梁锚固结构的试验研究
15.
Analysis of Stress strain at Anchorage between Box shaped Steel Beams and Cables in Cable stayed Bridge
斜拉桥钢箱梁索梁锚固区域应力应变分析
16.
On Bailey Beam Support System Used in the Construction of Self-anchor Suspension Bridge
用贝雷梁支架系统进行自锚式悬索桥主梁施工
17.
Stress distribution in anchorage zone between beam and cable for cable-stayed bridge with steel box girder
钢箱梁斜拉桥耳板式索梁锚固结构应力分布
18.
Its lower end is anchored at the erection truss by a clamp.
其下端由一夹钳锚定在施工桁梁上。